Table T7. Power consumption of the NEREID-191 system.

Subsystem
Condition
Power consumption
(W)
CRM
0.73
OBH Mass locked, short cable 2.7

Mass unlocked, short cable 2.5

Mass unlocked, measured at PDM 3.3
DC/DC for OBH No supply for OBH 0.3
DM24
1.55
SAM-191 No disk running 1.0

Disk powered (10 s) 8.16 (10 s)

Disk spin up 30.98 (maximum)

Disk write ~14.8 to ~15.8 (variable)

(average over disk operation period) (16.9)

Increase by running GPS receiver 0.15
MEG + 1 x OBH
4.0
MEG + 2 x OBH
7.33
SAM 11-hr cycle average for a typical amount of incoming data: (100 sps + 20 sps) x 6 channels x 2 bytes 1.77
Total average:

MEG + 2 x OBH + SAM
9.1

Note: CRM = combiner/repeater module, OBH = ocean borehole seismometer, DM24 = modular digitizer, SAM = storage acquisition module, MEG = multiple-access expandable gateway, PDM = power distribution module, GPS = Global Positioning System.