Figure F77. Preparations for the deployment of the power access terminal (PAT) battery frame. The halves of the PAT were positioned around the drill string, bolted, and welded together. Cable connections among all instruments (the seawater battery [SWB] cells, the accumulator, the power control system, the data logger, and the underwater mateable connectors) on the PAT were secured. From Sacks, Suyehiro, Acton, et al., 2000.