Table T1. Coring summary, Site 1179.

Hole 1179A
Latitude: 41°4.7884´N
Longitude: 159°57.7877´E
Time on site (hr): 730.5 (30 days 10 hr 30 min)
Time on hole (hr): 18 (2215 hr, 25 July-1615 hr, 26 July 2000)
Seafloor (drill-pipe measurement from rig floor, mbrf): 5576.5
Distance between rig floor and sea level (m): 11.0
Water depth (drill-pipe measurement from sea level, m): 5565.5
Total depth (drill-pipe measurement from rig floor, mbrf): 5586.5
Total penetration (meters below seafloor, mbsf): 10.0
Total length of cored section (m): 10.0
Total core recovered (m): 10.02
Core recovery (%): 100.2
Total number of cores: 1
Hole 1179B
Latitude: 41°4.7887´N
Longitude: 159°57.7879´E
Time on hole (hr): 11.75 (1615 hr, 26 July-0400 hr, 27 July 2000)
Seafloor (drill-pipe measurement from rig floor, mbrf): 5574.90
Distance between rig floor and sea level (m): 11.00
Water depth (drill-pipe measurement from sea level, m): 5563.90
Total depth (drill-pipe measurement from rig floor, mbrf): 5630.00
Total penetration (meters below seafloor, mbsf): 55.10
Total length of cored section (m): 55.10
Total length of drilled intervals (m): 0.00
Total core recovered (m): 55.89
Core recovery (%): 101.4
Total number of cores: 6
Hole 1179C
Latitude: 41°4.7871´N
Longitude: 159°57.7856´E
Time on hole (hr): 70.5 (0400 hr, 27 July-0230 hr, 30 July 2000)
Seafloor (drill-pipe measurement from rig floor, mbrf): 5576.7
Distance between rig floor and sea level (m): 12.8
Water depth (drill-pipe measurement from sea level, m): 5563.9
Total depth (drill-pipe measurement from rig floor, mbrf): 5869.6
Total penetration (meters below seafloor, mbsf): 292.9
Total length of cored section (m): 249.9
Total length of drilled intervals (m): 43.0
Total core recovered (m): 246.89
Core recovery (%): 98.8
Total number of cores: 27
Hole 1179D
Latitude: 41°4.8122´N
Longitude: 159°57.7862´E
Time on hole (hr): 177.5 (0230 hr, July 30-1200 hr, 6 August 2000)
Seafloor (drill-pipe measurement from rig floor, mbrf): 5577.0
Distance between rig floor and sea level (m): 11.0
Water depth (drill-pipe measurement from sea level, m): 5566.0
Total depth (drill-pipe measurement from rig floor, mbrf): 6052.0
Total penetration (meters below seafloor, mbsf): 475.0
Total length of cored section (m): 194.0
Total length of drilled intervals (m): 281.0
Total core recovered (m): 50.36
Core recovery (%): 26.0
Total number of cores: 22
Hole 1179E
Latitude: 41°4.7729´N
Longitude: 159°57.7973´E
Time on hole (hr): 362.75 (1200 hr, 6 August-21 August 2000)
Seafloor (drill-pipe measurement from rig floor, mbrf): 5577.0
Distance between rig floor and sea level (m): 11.1
Water depth (drill-pipe measurement from sea level, m): 5565.9
Total depth (drill-pipe measurement from rig floor, mbrf): 5976
Total penetration (meters below seafloor, mbsf): 475.0
Total length of drilled intervals (m): 475.0
Comments: Dedicated hole for seismometer emplacement. No coring.
 
Core Date
(2000)
Ship time
(local)
  Depth (mbsf)   Length (m)   Recovery
(%)
Top
Bottom
Cored
Recovered
191-1179A-








1H 26 July 1615
0.0 10.0
10.0 10.02
100.2





Total:
10.0 10.02
100.2
191-1179B-








1H 26 July 1745
0.0 7.6
7.6 7.53
99.1
2H 26 July 1900
7.6 17.1
9.5 9.14
96.2
3H 26 July 2020
17.1 26.6
9.5 10.04
105.7
4H 26 July 2200
26.6 36.1
9.5 9.46
99.6
5H 26 July 2340
36.1 45.6
9.5 10.07
106.0
6H 26 July 0110
45.6 55.1
9.5 9.65
101.6





Totals:
55.1 55.89
101.4
191-1179C-








1H 27 July 1435
0.0 5.8
5.8 5.83
100.5




*****Drilled from 5.8 to 48.8 mbsf*****

2H 27 July 1615
48.8 58.3
9.5 10.02
105.5
3H 27 July 1845
58.3 67.8
9.5 9.56
100.6
4H 27 July 2025
67.8 77.3
9.5 10.11
106.4
5H 27 July 2145
77.3 86.8
9.5 9.78
103.0
6H 27 July 2320
86.8 96.3
9.5 10.06
105.9
7H 28 July 0100
96.3 105.8
9.5 9.62
101.3
8H 28 July 0245
105.8 115.3
9.5 10.01
105.4
9H 28 July 0445
115.3 124.8
9.5 9.25
97.4
10H 28 July 0610
124.8 134.3
9.5 9.84
103.6
11H 28 July 0900
134.3 143.8
9.5 9.62
101.3
12H 28 July 1105
143.8 153.3
9.5 10.17
107.1
13H 28 July 1310
153.3 162.8
9.5 9.65
101.6
14H 28 July 1430
162.8 172.3
9.5 10.12
106.5
15H 28 July 1545
172.3 181.8
9.5 9.66
101.7
16H 28 July 1705
181.8 191.3
9.5 10.04
105.7
17H 28 July 1850
191.3 200.8
9.5 9.82
103.4
18H 28 July 2015
200.8 210.3
9.5 9.96
104.8
19H 28 July 2145
210.3 219.8
9.5 9.60
101.1
20H 28 July 2310
219.8 229.3
9.5 9.97
105.0
21H 29 July 0050
229.3 238.8
9.5 9.71
102.2
22H 29 July 0225
238.8 248.3
9.5 10.12
106.5
23H 29 July 0410
248.3 257.8
9.5 8.73
91.9
24H 29 July 0535
257.8 266.8
9.0 9.17
101.9
25X 29 July 0755
266.8 273.7
6.9 6.44
93.3
26X 29 July 0930
273.7 283.3
9.6 9.83
102.4
27X 29 July 1135
283.3 292.9
9.6 0.20
2.1




Coring totals:
249.9 246.89
98.8




Drilled totals:
43.0







Total:
292.9


191-1179D-












*****Drilled from 0 to 281.0 mbsf*****

1R 31 July 0950
281.0 290.6
9.6 0.98
10.2
2R 32 July 1130
290.6 300.2
9.6 0.19
2.0
3R 33 July 1425
300.2 309.8
9.6 0.26
2.7
4R 34 July 1655
309.8 319.4
9.6 0.99
10.3
5R 35 July 2015
319.4 329.0
9.6 0.57
5.9
6R 36 July 2235
329.0 338.6
9.6 0.82
8.5
7R 1 Aug 0110
338.6 348.2
9.6 1.10
11.5
8R 1 Aug 0325
348.2 357.9
9.7 0.25
2.6
9R 1 Aug 0625
357.9 367.5
9.6 0.65
6.8
10R 1 Aug 0930
367.5 377.1
9.6 1.09
11.4
11R 1 Aug 1410
377.1 386.7
9.6 2.53
26.4
12R 1 Aug 2045
386.7 390.4
3.7 4.58
123.8
13R 2 Aug 0305
390.4 396.4
6.0 5.00
83.3
14R 2 Aug 0955
396.4 406.0
9.6 3.85
40.1
15R 2 Aug 1515
406.0 415.7
9.7 0.19
2.0
16R 2 Aug 2115
415.7 418.8
3.1 0.18
5.8
17R 3 Aug 0425
418.8 425.3
6.5 2.67
41.1
18R 3 Aug 1040
425.3 434.9
9.6 4.69
48.9
19R 3 Aug 1830
434.9 444.6
9.7 3.36
34.6
20R 4 Aug 0420
444.6 454.2
9.6 5.20
54.2
21R 4 Aug 1140
454.2 463.8
9.6 4.79
49.9
22R 4 Aug 2140
463.8 475.0
11.2 6.42
57.3




Coring totals:
194.0 50.36
26.0




Drilled totals:
281.0







Total:
475.0


Note: This table is also available in ASCII format.