Table
T15. Summary of logging operations, Hole 1186A.
(Oct
2000)
(local)
27
2130
Hole
preparation (including flush with sepiolite) complete, rig wireline.
2305
Run
geophysical tool string into hole.
28
0105
Reach
bottom of hole.
0225
Finish
uplog at 274 m/hr from 1034 to 679 mbsf.
0255
Resume
logging below base of pipe.
0330
Finish
uplog at 274 m/hr from 162.6 mbsf to 16 m above seafloor. Pull out of
hole.
0430
Recover
geophysical tool string, begin preparing FMS/sonic tool string.
0615
Run
FMS/sonic tool string into hole.
0750
Reach
bottom of hole.
0815
Tool
string goes dead at 948 mbsf; reinitialize and run back to bottom of hole.
0940
Finish
uplog at 274 m/hr from 1032.7 to 690 mbsf. Lower for second pass.
1108
Finish
second uplog at 274 m/hr from 1033 to 975 mbsf.
1215
Recover
FMS/sonic tool string.
Note: FMS = Formation MicroScanner.