Table T15. Summary of logging operations, Hole 1186A.
 
Date
(Oct
2000)
Time
(local)
Activity
27 2130 Hole preparation (including flush with sepiolite) complete, rig wireline.

2305 Run geophysical tool string into hole.
28 0105 Reach bottom of hole.

0225 Finish uplog at 274 m/hr from 1034 to 679 mbsf.

0255 Resume logging below base of pipe.

0330 Finish uplog at 274 m/hr from 162.6 mbsf to 16 m above seafloor. Pull out of hole.

0430 Recover geophysical tool string, begin preparing FMS/sonic tool string.

0615 Run FMS/sonic tool string into hole.

0750 Reach bottom of hole.

0815 Tool string goes dead at 948 mbsf; reinitialize and run back to bottom of hole.

0940 Finish uplog at 274 m/hr from 1032.7 to 690 mbsf. Lower for second pass.

1108 Finish second uplog at 274 m/hr from 1033 to 975 mbsf.

1215 Recover FMS/sonic tool string.

Note: FMS = Formation MicroScanner.