Table T1. Coring summary, Site 1188.
 
Hole 1188A
Latitude: 3°43.6962´S
Longitude: 151°40.1964´E
Time on site (hr, min): 530, 15
(1730 hr, 18 Nov 2000-0830 hr, 22 Nov 2000;
0530 hr, 25 Nov 2000-1400 hr, 27 Nov 2000;
1100 hr, 29 Nov 2000-0700 hr, 30 Nov 2000;
0700 hr, 30 Nov 2000-1630 hr, 30 Nov 2000;
1630 hr, 30 Nov 2000-0245 hr, 1 Dec 2000;
0245 hr, 1 Dec 2000-2115 hr, 21 Dec 2000;
2115 hr, 21 Dec 2000-0745 hr, 22 Dec 2000;
1700 hr, 26 Dec 2000-1200 hr, 27 Dec 2000;
1515 hr, 29 Dec 2000-0400 hr, 30 Dec 2000)
Time on hole (hr): 87 (1730 hr, 18 Nov 2000-0830 hr, 22 Nov 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 1651.0
Distance between rig floor and sea level (m): 10.8
Water depth (drill pipe measurement from sea level, m): 1640.2
Total depth (from rig floor, mbrf): 1862.6
Total penetration (mbsf): 211.6
Total length of cored section (m): 211.6
Total core recovered (m): 21.93
Core recovery (%): 10.4
Total number of cores: 23
Hole 1188B
Latitude: 3°43.6962´S
Longitude: 151°40.1981´E
Time on hole (hr, min): 64, 15 (0530 hr, 25 Nov 2000-1400 hr, 27 Nov 2000)
Additional time on hole (hr, min): 10, 50 (2115 hr 21 Dec 2000-0745 hr 22 Dec 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 1653.0
Distance between rig floor and sea level (m): 10.9
Water depth (drill pipe measurement from sea level, m): 1642.1
Total depth (from rig floor, mbrf): 1725.0
Total penetration (mbsf): 72.0
Comments: LWD and ADCB only; no coring done.
Hole 1188C
Latitude: 3°43.6940´S
Longitude: 151°40.1741´E
Time on hole (hr): 20 (1100 hr, 29 Nov 2000-0700 hr, 30 Nov 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 1654.0
Distance between rig floor and sea level (m): 10.9
Water depth (drill pipe measurement from sea level, m): 1643.1
Total depth (from rig floor, mbrf): 1698.0
Total penetration (mbsf): 44.0
Total length of cored section (m): 0.0
Total length of drilled intervals (m): 44.0
Comments: No coring done.
Hole 1188D
Latitude: 3°43.6672´S
Longitude: 151°40.1780´E
Time on hole (hr, min): 9, 30 (0700 hr, 30 Nov 2000-1630 hr, 30 Nov 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 1645.0
Distance between rig floor and sea level (m): 10.9
Water depth (drill pipe measurement from sea level, m): 1634.1
Total depth (from rig floor, mbrf): 1660.0
Total penetration (mbsf): 15.0
Total length of cored section (m): 0.0
Total length of drilled intervals (m): 15.0
Comments: No coring done.
Hole 1188E
Latitude: 3°43.6842´S
Longitude: 151°40.1907´E
Time on hole (hr, min): 10, 15 (1630 hr, 30 Nov 2000-0245 hr, 1 Dec 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 1652.0
Distance between rig floor and sea level (m): 10.9
Water depth (drill pipe measurement from sea level, m): 1641.1
Total depth (from rig floor, mbrf): 1668.0
Total penetration (mbsf): 16.0
Total length of cored section (m): 0.0
Total length of drilled intervals (m): 16.0
Comments: No coring done.
Hole 1188F
Latitude: 3°43.6850´S
Longitude: 151°40.1909´E
Time on hole (hr, min): 498, 30 (0245 hr, 1 Dec 2000-2115 hr, 21 Dec 2000)
Additional time on hole (hr, min): 19 (1700 hr, 26 Dec 2000-1200, 27 Dec 2000);12, 45 (1515 hr, 29 Dec 2000-0400, 30 Dec 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 1653.0
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 1641.7
Total depth (from rig floor, mbrf): 2039.7
Total penetration (mbsf): 386.7
Total length of cored section (m): 168.7
Total length of drilled intervals (m): 218.0
Total core recovered (m): 30.89
Core recovery (%): 18.3
 
Length (m)
Core
Date (2000)
Time (local)
Top depth (mbsf)
Cored
Recovered
Recovery (%)
193-1188A-





1R 19 Nov 1425 0.0 9.6 0.00 0.0
2R 19 Nov 1640 9.6 9.6 0.20 2.1
3R 19 Nov 2025 19.2 9.7 0.10 1.0
4R 19 Nov 2310 28.9 4.7 0.09 1.9
5R 20 Nov 0225 33.6 5.0 0.29 5.8
6R 20 Nov 0350 38.6 9.6 0.07 0.7
7R 20 Nov 0545 48.2 9.7 1.67 17.2
8R 20 Nov 0715 57.9 9.7 1.87 19.3
9R 20 Nov 0835 67.6 9.7 2.60 26.8
10R 20 Nov 1055 77.3 9.6 1.69 17.6
11R 20 Nov 1300 86.9 9.7 1.72 17.7
12R 20 Nov 1505 96.6 9.7 1.64 16.9
13R 20 Nov 1630 106.3 9.7 1.14 11.8
14R 20 Nov 1915 116.0 9.7 1.13 11.6
15R 20 Nov 2210 125.7 9.7 0.80 8.2
16R 21 Nov 0010 135.4 9.7 1.96 20.2
17R 21 Nov 0220 145.1 9.6 1.07 11.1
18R 21 Nov 0400 154.7 9.6 0.75 7.8
19R 21 Nov 0515 164.3 9.6 0.69 7.2
20R 21 Nov 0615 173.9 9.2 0.93 10.1
21R 21 Nov 0710 183.1 9.6 1.23 12.8
22R 21 Nov 0805 192.7 9.4 0.11 1.2
23R 21 Nov 0930 202.1 9.5 0.18 1.9
193-1188B-





1O 26 Nov 0500 0.0 0.0 0.00 NA
1Z 27 Nov 0940 72.0 0.0 0.15 0.0
193-1188C-





1O 30 Nov 0530 0.0 0.0 0.00 NA
193-1188D-





1O 30 Nov 1400 0.0 0.0 0.00 NA
193-1188E-





1O 1 Dec 0230 0.0 0.0 0.00 NA
193-1188F-





1Z 12 Dec 2020 218.0 3.5 2.50 71.4
2Z 12 Dec 2250 221.5 1.1 0.75 68.2
3Z 13 Dec 0145 222.6 2.5 2.15 86.0
4Z 13 Dec 0530 225.1 3.3 0.00 0.0
5Z 13 Dec 1130 228.4 4.7 0.00 0.0
6Z 13 Dec 1425 233.1 1.9 1.55 81.6
7Z 13 Dec 1720 235.0 1.2 1.05 87.5
8Z 13 Dec 1945 236.2 1.5 0.95 63.3
9Z 13 Dec 2130 237.7 0.6 0.55 91.7
10Z 13 Dec 2315 238.3 0.6 0.00 0.0
11G 13 Dec 0000 238.9 0.0 0.00 NA
12Z 14 Dec 0615 238.9 2.5 0.00 0.0
13Z 14 Dec 0905 241.4 4.5 1.10 24.4
14Z 14 Dec 1140 245.9 4.5 1.10 24.4
15Z 14 Dec 1400 250.4 4.5 0.95 21.1
16Z 14 Dec 1635 254.9 4.5 0.65 14.4
17Z 14 Dec 1900 259.4 4.5 0.11 2.4
18Z 14 Dec 2145 263.9 4.5 0.20 4.4
19Z 15 Dec 0025 268.4 4.5 0.32 7.1
20Z 15 Dec 0225 272.9 4.7 0.00 0.0
21Z 15 Dec 0500 277.6 4.5 0.00 0.0
22Z 15 Dec 0730 282.1 4.5 0.40 8.9
23Z 15 Dec 1020 286.6 4.5 1.20 26.7
24Z 15 Dec 1300 291.1 4.5 0.00 0.0
25Z 15 Dec 1555 295.6 4.5 0.30 6.7
26Z 15 Dec 1940 300.1 4.5 2.10 46.7
27Z 15 Dec 2220 304.6 4.5 0.31 6.9
28Z 16 Dec 0145 309.1 4.5 0.00 0.0
29Z 16 Dec 0445 313.6 4.5 0.00 0.0
30Z 16 Dec 0725 318.1 4.5 0.10 2.2
31Z 16 Dec 1030 322.6 4.6 0.30 6.5
32Z 18 Dec 0635 327.2 4.7 0.00 0.0
33Z 18 Dec 1010 331.9 4.5 0.00 0.0
34Z 18 Dec 1245 336.4 3.6 1.20 33.3
35Z 18 Dec 1650 340.0 4.5 0.85 18.9
36G 18 Dec 2130 344.5 0.0 0.00 NA
37Z 18 Dec 2340 344.5 4.5 2.61 58.0
38Z 19 Dec 0255 349.0 4.5 2.15 47.8
39Z 19 Dec 0815 353.5 4.5 1.00 22.2
40Z 19 Dec 1045 358.0 4.5 1.15 25.6
41Z 19 Dec 1310 362.5 4.5 0.75 16.7
42Z 19 Dec 1540 367.0 4.5 0.75 16.7
43Z 19 Dec 1845 371.5 2.5 0.99 39.6
44Z 19 Dec 2215 374.0 4.5 0.80 17.8
45Z 20 Dec 0245 378.5 4.5 0.00 0.0
46Z 20 Dec 0645 383.0 2.6 0.00 0.0
47Z 20 Dec 1045 385.6 1.1 0.00 0.0

Notes: LWD = logging while drilling, ADCB = advanced diamond core barrel. NA = not applicable.