Table
T1. Coring summary, Site 1188.
Hole
1188A
Latitude:
3°43.6962´S
Longitude:
151°40.1964´E
Time
on site (hr, min): 530, 15
(1730
hr, 18 Nov 2000-0830 hr, 22 Nov 2000;
0530
hr, 25 Nov 2000-1400 hr, 27 Nov 2000;
1100
hr, 29 Nov 2000-0700 hr, 30 Nov 2000;
0700
hr, 30 Nov 2000-1630 hr, 30 Nov 2000;
1630
hr, 30 Nov 2000-0245 hr, 1 Dec 2000;
0245
hr, 1 Dec 2000-2115 hr, 21 Dec 2000;
2115
hr, 21 Dec 2000-0745 hr, 22 Dec 2000;
1700
hr, 26 Dec 2000-1200 hr, 27 Dec 2000;
1515
hr, 29 Dec 2000-0400 hr, 30 Dec 2000)
Time
on hole (hr): 87 (1730 hr, 18 Nov 2000-0830 hr, 22 Nov 2000)
Seafloor
(drill pipe measurement from rig floor, mbrf): 1651.0
Distance
between rig floor and sea level (m): 10.8
Water
depth (drill pipe measurement from sea level, m): 1640.2
Total
depth (from rig floor, mbrf): 1862.6
Total
penetration (mbsf): 211.6
Total
length of cored section (m): 211.6
Total
core recovered (m): 21.93
Core
recovery (%): 10.4
Total
number of cores: 23
Hole
1188B
Latitude:
3°43.6962´S
Longitude:
151°40.1981´E
Time
on hole (hr, min): 64, 15 (0530 hr, 25 Nov 2000-1400 hr, 27 Nov 2000)
Additional
time on hole (hr, min): 10, 50 (2115 hr 21 Dec 2000-0745 hr 22 Dec 2000)
Seafloor
(drill pipe measurement from rig floor, mbrf): 1653.0
Distance
between rig floor and sea level (m): 10.9
Water
depth (drill pipe measurement from sea level, m): 1642.1
Total
depth (from rig floor, mbrf): 1725.0
Total
penetration (mbsf): 72.0
Comments:
LWD and ADCB only; no coring done.
Hole
1188C
Latitude:
3°43.6940´S
Longitude:
151°40.1741´E
Time
on hole (hr): 20 (1100 hr, 29 Nov 2000-0700 hr, 30 Nov 2000)
Seafloor
(drill pipe measurement from rig floor, mbrf): 1654.0
Distance
between rig floor and sea level (m): 10.9
Water
depth (drill pipe measurement from sea level, m): 1643.1
Total
depth (from rig floor, mbrf): 1698.0
Total
penetration (mbsf): 44.0
Total
length of cored section (m): 0.0
Total
length of drilled intervals (m): 44.0
Comments:
No coring done.
Hole
1188D
Latitude:
3°43.6672´S
Longitude:
151°40.1780´E
Time
on hole (hr, min): 9, 30 (0700 hr, 30 Nov 2000-1630 hr, 30 Nov 2000)
Seafloor
(drill pipe measurement from rig floor, mbrf): 1645.0
Distance
between rig floor and sea level (m): 10.9
Water
depth (drill pipe measurement from sea level, m): 1634.1
Total
depth (from rig floor, mbrf): 1660.0
Total
penetration (mbsf): 15.0
Total
length of cored section (m): 0.0
Total
length of drilled intervals (m): 15.0
Comments:
No coring done.
Hole
1188E
Latitude:
3°43.6842´S
Longitude:
151°40.1907´E
Time
on hole (hr, min): 10, 15 (1630 hr, 30 Nov 2000-0245 hr, 1 Dec 2000)
Seafloor
(drill pipe measurement from rig floor, mbrf): 1652.0
Distance
between rig floor and sea level (m): 10.9
Water
depth (drill pipe measurement from sea level, m): 1641.1
Total
depth (from rig floor, mbrf): 1668.0
Total
penetration (mbsf): 16.0
Total
length of cored section (m): 0.0
Total
length of drilled intervals (m): 16.0
Comments:
No coring done.
Hole
1188F
Latitude:
3°43.6850´S
Longitude:
151°40.1909´E
Time
on hole (hr, min): 498, 30 (0245 hr, 1 Dec 2000-2115 hr, 21 Dec 2000)
Additional
time on hole (hr, min): 19 (1700 hr, 26 Dec 2000-1200, 27 Dec 2000);12, 45
(1515 hr, 29 Dec 2000-0400, 30 Dec 2000)
Seafloor
(drill pipe measurement from rig floor, mbrf): 1653.0
Distance
between rig floor and sea level (m): 11.3
Water
depth (drill pipe measurement from sea level, m): 1641.7
Total
depth (from rig floor, mbrf): 2039.7
Total
penetration (mbsf): 386.7
Total
length of cored section (m): 168.7
Total
length of drilled intervals (m): 218.0
Total
core recovered (m): 30.89
Core
recovery (%): 18.3
Length
(m)
193-1188A-
1R
19
Nov
1425
0.0
9.6
0.00
0.0
2R
19
Nov
1640
9.6
9.6
0.20
2.1
3R
19
Nov
2025
19.2
9.7
0.10
1.0
4R
19
Nov
2310
28.9
4.7
0.09
1.9
5R
20
Nov
0225
33.6
5.0
0.29
5.8
6R
20
Nov
0350
38.6
9.6
0.07
0.7
7R
20
Nov
0545
48.2
9.7
1.67
17.2
8R
20
Nov
0715
57.9
9.7
1.87
19.3
9R
20
Nov
0835
67.6
9.7
2.60
26.8
10R
20
Nov
1055
77.3
9.6
1.69
17.6
11R
20
Nov
1300
86.9
9.7
1.72
17.7
12R
20
Nov
1505
96.6
9.7
1.64
16.9
13R
20
Nov
1630
106.3
9.7
1.14
11.8
14R
20
Nov
1915
116.0
9.7
1.13
11.6
15R
20
Nov
2210
125.7
9.7
0.80
8.2
16R
21
Nov
0010
135.4
9.7
1.96
20.2
17R
21
Nov
0220
145.1
9.6
1.07
11.1
18R
21
Nov
0400
154.7
9.6
0.75
7.8
19R
21
Nov
0515
164.3
9.6
0.69
7.2
20R
21
Nov
0615
173.9
9.2
0.93
10.1
21R
21
Nov
0710
183.1
9.6
1.23
12.8
22R
21
Nov
0805
192.7
9.4
0.11
1.2
23R
21
Nov
0930
202.1
9.5
0.18
1.9
193-1188B-
1O
26
Nov
0500
0.0
0.0
0.00
NA
1Z
27
Nov
0940
72.0
0.0
0.15
0.0
193-1188C-
1O
30
Nov
0530
0.0
0.0
0.00
NA
193-1188D-
1O
30
Nov
1400
0.0
0.0
0.00
NA
193-1188E-
1O
1
Dec
0230
0.0
0.0
0.00
NA
193-1188F-
1Z
12
Dec
2020
218.0
3.5
2.50
71.4
2Z
12
Dec
2250
221.5
1.1
0.75
68.2
3Z
13
Dec
0145
222.6
2.5
2.15
86.0
4Z
13
Dec
0530
225.1
3.3
0.00
0.0
5Z
13
Dec
1130
228.4
4.7
0.00
0.0
6Z
13
Dec
1425
233.1
1.9
1.55
81.6
7Z
13
Dec
1720
235.0
1.2
1.05
87.5
8Z
13
Dec
1945
236.2
1.5
0.95
63.3
9Z
13
Dec
2130
237.7
0.6
0.55
91.7
10Z
13
Dec
2315
238.3
0.6
0.00
0.0
11G
13
Dec
0000
238.9
0.0
0.00
NA
12Z
14
Dec
0615
238.9
2.5
0.00
0.0
13Z
14
Dec
0905
241.4
4.5
1.10
24.4
14Z
14
Dec
1140
245.9
4.5
1.10
24.4
15Z
14
Dec
1400
250.4
4.5
0.95
21.1
16Z
14
Dec
1635
254.9
4.5
0.65
14.4
17Z
14
Dec
1900
259.4
4.5
0.11
2.4
18Z
14
Dec
2145
263.9
4.5
0.20
4.4
19Z
15
Dec
0025
268.4
4.5
0.32
7.1
20Z
15
Dec
0225
272.9
4.7
0.00
0.0
21Z
15
Dec
0500
277.6
4.5
0.00
0.0
22Z
15
Dec
0730
282.1
4.5
0.40
8.9
23Z
15
Dec
1020
286.6
4.5
1.20
26.7
24Z
15
Dec
1300
291.1
4.5
0.00
0.0
25Z
15
Dec
1555
295.6
4.5
0.30
6.7
26Z
15
Dec
1940
300.1
4.5
2.10
46.7
27Z
15
Dec
2220
304.6
4.5
0.31
6.9
28Z
16
Dec
0145
309.1
4.5
0.00
0.0
29Z
16
Dec
0445
313.6
4.5
0.00
0.0
30Z
16
Dec
0725
318.1
4.5
0.10
2.2
31Z
16
Dec
1030
322.6
4.6
0.30
6.5
32Z
18
Dec
0635
327.2
4.7
0.00
0.0
33Z
18
Dec
1010
331.9
4.5
0.00
0.0
34Z
18
Dec
1245
336.4
3.6
1.20
33.3
35Z
18
Dec
1650
340.0
4.5
0.85
18.9
36G
18
Dec
2130
344.5
0.0
0.00
NA
37Z
18
Dec
2340
344.5
4.5
2.61
58.0
38Z
19
Dec
0255
349.0
4.5
2.15
47.8
39Z
19
Dec
0815
353.5
4.5
1.00
22.2
40Z
19
Dec
1045
358.0
4.5
1.15
25.6
41Z
19
Dec
1310
362.5
4.5
0.75
16.7
42Z
19
Dec
1540
367.0
4.5
0.75
16.7
43Z
19
Dec
1845
371.5
2.5
0.99
39.6
44Z
19
Dec
2215
374.0
4.5
0.80
17.8
45Z
20
Dec
0245
378.5
4.5
0.00
0.0
46Z
20
Dec
0645
383.0
2.6
0.00
0.0
47Z
20
Dec
1045
385.6
1.1
0.00
0.0
Notes: LWD = logging while drilling, ADCB = advanced diamond core barrel. NA = not applicable.