Table T1. Coring summary, Site 1189.
 
Hole 1189A
Latitude: 3°43.244´S
Longitude: 151°40.493´E
Time on site (hr, min): 159, 45 (0830 hr, 22 Nov 2000-2045 hr, 23 Nov 2000;
0745 hr, 22 Dec 2000-1700 hr, 26 Dec 2000
1200 hr, 27 Dec 2000-1515 hr, 29 Dec 2000)
Time on hole (hr, min): 36, 15 (0830 hr, 22 Nov 2000-2045 hr, 23 Nov 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 1701.0
Distance between rig floor and sea level (m): 10.8
Water depth (drill pipe measurement from sea level, m): 1690.2
Total depth (from rig floor, mbrf): 1826.8
Total penetration (mbsf): 125.8
Total length of cored section (m): 125.8
Total length of drilled intervals (m): 0.0
Total core recovered (m): 8.58
Core recovery (%): 6.8
Total number of cores: 13
Hole 1189B
Latitude: 3°43.236´S
Longitude: 151°40.508´E
Time on hole (hr, min): 105, 15 (0745 hr, 22 Dec 2000-1700 hr, 26 Dec 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 1693.0
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level, m): 1683.0
Total depth (from rig floor, mbrf): 1899.0
Total penetration (mbsf): 206.0
Total length of cored section (m): 175.0
Total length of drilled intervals (m): 31.0
Total core recovered (m): 13.69
Core recovery (%): 7.8
Total number of cores: 18
Hole 1189C
Latitude: 3°43.242´S
Longitude: 151°40.524´E
Time on hole (hr, min): 51, 15 (1200 hr, 27 Dec 2000-1515 hr, 29 Dec 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 1700.0
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level, m): 1689.0
Total depth (from rig floor, mbrf): 1866.0
Total penetration (mbsf): 166.0
Total length of cored section (m): 0.0
Total length of drilled intervals (m): 166.0
Comments: LWD and RAB only
 
Core Date
(2000)
Time
(local)
Top
depth
(mbsf)
Length (m) Recovery
(%)
Cored
Recovered
193-1189A-




1R 22 Nov 1800 0.0 9.7 0.22 2.3
2R 22 Nov 1935 9.7 9.7 0.88 9.1
3R 22 Nov 2045 19.4 9.7 0.68 7.0
4R 22 Nov 2200 29.1 9.7 0.19 2.0
5R 22 Nov 2310 38.8 9.8 0.48 4.9
6R 23 Nov 0030 48.6 9.7 0.39 4.0
7R 23 Nov 0210 58.3 9.7 0.80 8.2
8R 23 Nov 0340 68.0 9.7 0.92 9.5
9R 23 Nov 0500 77.7 9.6 0.71 7.4
10R 23 Nov 0620 87.3 9.6 1.11 11.6
11R 23 Nov 0715 96.9 9.6 0.76 7.9
12R 23 Nov 0815 106.5 9.6 0.94 9.8
13R 23 Nov 1110 116.1 9.7 0.50 5.2
193-1189B-




1R 24 Dec 0910 31.0 9.1 0.10 1.1
2R 24 Dec 1000 40.1 9.6 0.10 1.0
3R 24 Dec 1050 49.7 9.8 0.10 1.0
4R 24 Dec 1145 59.5 9.8 0.00 0.0
5R 24 Dec 1300 69.3 9.7 0.05 0.5
6R 24 Dec 1420 79.0 9.7 0.15 1.5
7R 24 Dec 1545 88.7 9.7 0.05 0.5
8R 24 Dec 1635 98.4 9.7 0.20 2.1
9R 24 Dec 1720 108.1 9.8 0.05 0.5
10R 24 Dec 1915 117.9 9.7 0.64 6.6
11R 24 Dec 2135 127.6 9.7 1.72 17.7
12R 25 Dec 0045 137.3 9.7 2.80 28.9
13R 25 Dec 0210 147.0 9.5 0.41 4.3
14R 25 Dec 0400 156.5 9.6 1.16 12.1
15R 25 Dec 0555 166.1 9.6 1.81 18.9
16R 25 Dec 0830 175.7 9.6 1.41 14.7
17R 25 Dec 1010 185.3 9.7 0.83 8.6
18R 25 Dec 1240 195.0 11.0 2.11 19.2

Note: LWD = logging while drilling, RAB = resistivity at bit.