Table
T1. Coring summary, Site 1189.
Hole
1189A
Latitude:
3°43.244´S
Longitude:
151°40.493´E
Time
on site (hr, min): 159, 45 (0830 hr, 22 Nov 2000-2045 hr, 23 Nov 2000;
0745
hr, 22 Dec 2000-1700 hr, 26 Dec 2000
1200
hr, 27 Dec 2000-1515 hr, 29 Dec 2000)
Time
on hole (hr, min): 36, 15 (0830 hr, 22 Nov 2000-2045 hr, 23 Nov 2000)
Seafloor
(drill pipe measurement from rig floor, mbrf): 1701.0
Distance
between rig floor and sea level (m): 10.8
Water
depth (drill pipe measurement from sea level, m): 1690.2
Total
depth (from rig floor, mbrf): 1826.8
Total
penetration (mbsf): 125.8
Total
length of cored section (m): 125.8
Total
length of drilled intervals (m): 0.0
Total
core recovered (m): 8.58
Core
recovery (%): 6.8
Total
number of cores: 13
Hole
1189B
Latitude:
3°43.236´S
Longitude:
151°40.508´E
Time
on hole (hr, min): 105, 15 (0745 hr, 22 Dec 2000-1700 hr, 26 Dec 2000)
Seafloor
(drill pipe measurement from rig floor, mbrf): 1693.0
Distance
between rig floor and sea level (m): 11.0
Water
depth (drill pipe measurement from sea level, m): 1683.0
Total
depth (from rig floor, mbrf): 1899.0
Total
penetration (mbsf): 206.0
Total
length of cored section (m): 175.0
Total
length of drilled intervals (m): 31.0
Total
core recovered (m): 13.69
Core
recovery (%): 7.8
Total
number of cores: 18
Hole
1189C
Latitude:
3°43.242´S
Longitude:
151°40.524´E
Time
on hole (hr, min): 51, 15 (1200 hr, 27 Dec 2000-1515 hr, 29 Dec 2000)
Seafloor
(drill pipe measurement from rig floor, mbrf): 1700.0
Distance
between rig floor and sea level (m): 11.0
Water
depth (drill pipe measurement from sea level, m): 1689.0
Total
depth (from rig floor, mbrf): 1866.0
Total
penetration (mbsf): 166.0
Total
length of cored section (m): 0.0
Total
length of drilled intervals (m): 166.0
Comments:
LWD and RAB only
Core
Date
(2000)Time
(local)Top
depth
(mbsf)Length
(m)
Recovery
(%)
193-1189A-
1R
22
Nov
1800
0.0
9.7
0.22
2.3
2R
22
Nov
1935
9.7
9.7
0.88
9.1
3R
22
Nov
2045
19.4
9.7
0.68
7.0
4R
22
Nov
2200
29.1
9.7
0.19
2.0
5R
22
Nov
2310
38.8
9.8
0.48
4.9
6R
23
Nov
0030
48.6
9.7
0.39
4.0
7R
23
Nov
0210
58.3
9.7
0.80
8.2
8R
23
Nov
0340
68.0
9.7
0.92
9.5
9R
23
Nov
0500
77.7
9.6
0.71
7.4
10R
23
Nov
0620
87.3
9.6
1.11
11.6
11R
23
Nov
0715
96.9
9.6
0.76
7.9
12R
23
Nov
0815
106.5
9.6
0.94
9.8
13R
23
Nov
1110
116.1
9.7
0.50
5.2
193-1189B-
1R
24
Dec
0910
31.0
9.1
0.10
1.1
2R
24
Dec
1000
40.1
9.6
0.10
1.0
3R
24
Dec
1050
49.7
9.8
0.10
1.0
4R
24
Dec
1145
59.5
9.8
0.00
0.0
5R
24
Dec
1300
69.3
9.7
0.05
0.5
6R
24
Dec
1420
79.0
9.7
0.15
1.5
7R
24
Dec
1545
88.7
9.7
0.05
0.5
8R
24
Dec
1635
98.4
9.7
0.20
2.1
9R
24
Dec
1720
108.1
9.8
0.05
0.5
10R
24
Dec
1915
117.9
9.7
0.64
6.6
11R
24
Dec
2135
127.6
9.7
1.72
17.7
12R
25
Dec
0045
137.3
9.7
2.80
28.9
13R
25
Dec
0210
147.0
9.5
0.41
4.3
14R
25
Dec
0400
156.5
9.6
1.16
12.1
15R
25
Dec
0555
166.1
9.6
1.81
18.9
16R
25
Dec
0830
175.7
9.6
1.41
14.7
17R
25
Dec
1010
185.3
9.7
0.83
8.6
18R
25
Dec
1240
195.0
11.0
2.11
19.2
Note: LWD = logging while drilling, RAB = resistivity at bit.