Table T13. Summary of logging operations, Hole 1194B.
 
Date
(Jan
2001)
Time
(local)
Comments
25 0530 Hole preparation complete. Rig up wireline.

0715 RIH with MGT-HNGS-APS-HLDS-DITE (+TAP).

0755 Uplog with triple combo at 900 ft/hr from 425 mbsf to seafloor. Rig into hole to TD.

0950 Uplog with MGT at 700 ft/hr from 425 to 75 mbsf. Rig into hole for short repeat.

1135 Uplog with MGT at 700 ft/hr from 134.5 to 65 mbsf. Pull out of hole.

1345 Rig up NGT-DSI-FMS.

1425 RIH with NGT-DSI-FMS.

1515 Uplog at 900 ft/hr from 425 mbsf to pipe. Pull out of hole.

1630 Rig up NGT-LSS-FMS.

1810 Uplog at 900 ft/hr from 425 to pipe. Pull out of hole.

2130 Rig up WST.

1045 Tight spot prevents the tool from going deeper than 157 mbsf. Start check shots.

1150 Pull out of hole and rig down.
26 0030 End of logging operations.

Notes: RIH = run in hole, MGT = Lamont multisensor gamma ray tool, HNGS = hostile-environment natural gamma ray sonde, APS = accelerator porosity sonde, HLDS = high-temperature lithodensity sonde, DITE = dual induction tool, TAP = high-temperature/acceleration/pressure tool. TD = total depth. NGT = natural gamma ray tool, DSI = dipole shear sonic imager, FMS = Formation MicroScanner, LSS = long-spaced sonic tool, WST = well seismic tool. Drillers total depth = 427.1 mbsf, water depth = 384.8 mbrf, end of pipe = 78.93 mbsf.