Table T14. Logging operations, Hole 1196A.

Date
(Feb
2001)
Time
(local)
Comments
3 1030 Hole preparation complete; rig up wireline.

1135 RIH with MGT-HNGS-APS-HLDS-DITE (+TAP).

1140 Tools pulled back. MGT is taken off the combination because of connection problems.

1215 RIH with HNGS-APS-HLDS-DITE (+TAP).

1315 Uplog with triple combo at 900 ft/hr from tight spot at 510 mbsf to seafloor.

1515 Pull tools out of hole and rig down.

1615 Rig up NGT-LSS-FMS.

1425 RIH with NGT-LSS-FMS.

1720 Tool cannot pass obstacle in the pipe. Pull tools back on the rig floor and start clearing pipe.

2135 RIH with NGT-LSS-FMS.

2220 Uplog at 900 ft/hr from 523 mbsf to pipe. Going down again for a repeat run.
4 0020 Uplog at 900 ft/hr from 520 to pipe. Pull out of hole.

0300 Rig up WST.

0350 Start check shots from 523.5 mbsf with 13 shotpoints.

0530 Pull out of hole and rig down.

0645 End of logging operations.

Notes: RIH = run in hole, MGT = Lamont multisensor gamma ray tool, HNGS = hostile environment natural gamma ray sonde, APS = accelerator porosity sonde, HLDS = high-temperature lithodensity sonde, DITE = dual induction tool, TAP = high-temperature/acceleration/pressure tool, NGT = natural gamma-ray tool, LSS = long-spaced sonic tool, FMS =Formation MicroScanner, WST = well seismic tool. Drillers total depth = 672.2 mbsf, water depth = 315.2 mbrf, end of pipe = 71.8 mbsf.