Table
T13. Logging operations, Hole 1198B.
(Feb
2001)
(local)
10
2020
Hole
preparation complete; rig up wireline.
2140
RIH
with HNGS-APS-HLDS-DITE.
2240
Uplog
with triple combo at 900 ft/hr from tight spot at 235.5 mbsf to seafloor.
11
0130
Pull
tools out of hole and rig down.
0145
End
of logging operations.