Table T13. Logging operations, Hole 1198B.
 
Date
(Feb
2001)
Time
(local)
Comments
10 2020 Hole preparation complete; rig up wireline.

2140 RIH with HNGS-APS-HLDS-DITE.

2240 Uplog with triple combo at 900 ft/hr from tight spot at 235.5 mbsf to seafloor.
11 0130 Pull tools out of hole and rig down.

0145 End of logging operations.

Notes: RIH = run in hole, HNGS = hostile environment natural gamma ray sonde, APS = accelerator porosity sonde, DITE = dual induction tool, HLDS = high-temperature lithodensity sonde. Drillers total depth = 522.5 mbsf, water depth = 331.5 mbrf, end of pipe = 74 mbsf.