Table T1. Coring summary, Site 1201.
 
Hole 1201A
Latitude: 19°17.8830'N
Longitude: 135°5.9501'E
Time on site (hr): 557.00 (1600 hr, 31 Mar-1715 hr, 3 Apr 2001; 0715 hr, 5 Apr-1100 hr, 25 Apr 2001)
Time on hole (hr): 23.75 (1600 hr, 31 Mar-1545 hr, 1 Apr 2001)
Seafloor (drill pipe measurement from rig floor, mbrf): 5721.0
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 5709.9
Total depth (drill pipe measurement from rig floor, mbrf): 5722.6
Total penetration (meters below seafloor, mbsf): 1.60
Total length of cored section (m): 1.6
Total core recovered (m): 1.49
Core recovery (%): 93.1
Total number of cores: 1
Hole 1201B
Latitude: 19°17.8788'N
Longitude: 135°5.9506'E
Time on hole (hr): 26.5 (1545 hr, 1 Apr-1815 hr, 2 Apr 2001)
Seafloor (drill pipe measurement from rig floor, mbrf): 5721.3
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 5710.2
Total depth (drill pipe measurement from rig floor, mbrf): 5811.6
Total penetration (meters below seafloor, mbsf): 90.30
Total length of cored section (m): 90.3
Total core recovered (m): 65.91
Core recovery (%): 73.0
Total number of cores: 11
Hole 1201C
Latitude: 19°17.8829'N
Longitude: 135°5.9408'E
Time on hole (hr): 23.0 (1815 hr, 2 Apr-1715 hr, 3 Apr 2001)
Seafloor (drill pipe measurement from rig floor, mbrf): 5720.9
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 5709.8
Total depth (drill pipe measurement from rig floor, mbrf): 5769.0
Total penetration (meters below seafloor, mbsf): 48.1
Total length of cored section (m): 48.1
Total core recovered (m): 49.51
Core recovery (%): 102.9
Total number of cores: 6
Hole 1201D
Latitude: 19°17.8165'N
Longitude: 135°5.9519'E
Time on hole (hr): 210.25 (0715 hr, 5 Apr-0130 hr, 14 Apr 2001 hr)
Seafloor (drill pipe measurement from rig floor, mbrf): 5720.0
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 5708.7
Total depth (drill pipe measurement from rig floor, mbrf): 6320.0
Total penetration (meters below seafloor, mbsf): 600.0
Total length of cored section (m): 519.6
Total length of drilled intervals (m): 80.4
Total core recovered (m): 406.79
Core recovery (%): 78.3
Total number of cores: 55
Total number of drilled intervals: 1
Hole 1201E
Latitude: 19°17.8542'N
Longitude: 135°5.9491'E
Time on hole (hr): 273.50 (0130 hr, 14 Apr-1100 hr, 25 Apr 2001)
Seafloor (drill pipe measurement from rig floor, mbrf): 5721.0
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level, m): 5710.0
Total depth (drill pipe measurement from rig floor, mbrf): 6301.0
Total penetration (meters below seafloor, mbsf): 580.0
Total core recovered (m): 0
Total length of drilled intervals (m): 580.0
Comment: Hole 1201E was drilled and cased to install the ION instrumentation.
 
Core Date
(April
2001)
Time
(local)
  Depth (mbsf)   Length (m)   Recovery
(%)
Comments
Top
Bottom
Cored
Recovered
195-1201A-









1H 1 1540
0.0 1.6
1.6 1.49
93.1





Totals:
1.6 1.49
93.1
195-1201B-









1H 1 2000
0.0 7.2
7.2 7.12
98.9
2H 1 2250
7.2 16.7
9.5 10.10
106.3
3H 2 0020
16.7 26.2
9.5 9.80
103.2 Oriented
4H 2 0155
26.2 35.7
9.5 10.03
105.6 Oriented
5H 2 0325
35.7 45.2
9.5 9.67
101.8 Oriented
6H 2 0500
45.2 46.7
1.5 1.63
108.7 Oriented
7X 2 0700
46.7 51.9
5.2 5.82
111.9
8X 2 0850
51.9 61.5
9.6 8.14
84.8
9X 2 1145
61.5 71.1
9.6 1.30
13.5 AHC
10X 2 1410
71.1 80.7
9.6 1.93
20.1 AHC
11X 2 1715
80.7 90.3
9.6 0.37
3.9 AHC





Totals:
90.3 65.91
73.0
195-1201C-









1H 1 2020
0.0 6.6
6.6 6.51
98.6
2H 1 2200
6.6 16.1
9.5 9.85
103.7
3H 3 0035
16.1 25.6
9.5 9.83
103.5 Oriented; Adara
4H 3 0225
25.6 35.1
9.5 10.04
105.7 Oriented
5H 3 0435
35.1 44.6
9.5 9.78
102.9 Oriented; Adara
6H 3 0635
44.6 48.1
3.5 3.50
100.0 Oriented





Totals:
48.1 49.51
102.9
195-1201D-













*****Drilled from 0.0 to 80.4 mbsf*****

AHC; drilled interval
1R 6 0030
80.4 90.0
9.6 6.58
68.5 AHC
2R 6 0340
90.0 99.6
9.6 8.74
91.0 AHC
3R 6 0715
99.6 109.2
9.6 8.73
90.9 AHC
4R 6 1030
109.2 118.8
9.6 9.82
102.3 AHC
5R 6 1325
118.8 128.4
9.6 9.41
98.0 AHC
6R 6 1530
128.4 138.0
9.6 8.66
90.2 AHC
7R 6 1740
138.0 147.6
9.6 8.98
93.5 AHC
8R 6 1910
147.6 157.2
9.6 9.48
98.8 AHC
9R 6 2035
157.2 166.8
9.6 8.90
92.7 AHC
10R 6 2205
166.8 176.4
9.6 5.54
57.7 AHC
11R 6 2350
176.4 186.1
9.7 9.94
102.5 AHC
12R 7 0135
186.1 195.7
9.6 8.66
90.2 AHC
13R 7 0335
195.7 205.3
9.6 8.82
91.9 AHC
14R 7 0525
205.3 214.9
9.6 7.37
76.8 AHC
15R 7 0700
214.9 224.5
9.6 4.10
42.7 AHC
16R 7 0835
224.5 234.1
9.6 6.28
65.4 AHC
17R 7 1005
234.1 243.8
9.7 8.36
86.2 AHC
18R 7 1200
243.8 253.4
9.6 9.87
102.8 AHC
19R 7 1325
253.4 263.0
9.6 8.60
89.6 AHC
20R 7 1450
263.0 272.6
9.6 8.30
86.5 AHC
21R 7 1620
272.6 282.3
9.7 8.38
86.4 AHC
22R 7 1745
282.3 291.9
9.6 8.58
89.4 AHC
23R 7 1910
291.9 301.5
9.6 9.15
95.3 AHC
24R 7 2040
301.5 311.1
9.6 6.05
63.0 AHC
25R 7 2220
311.1 320.7
9.6 6.29
65.5 AHC
26R 7 2355
320.7 330.3
9.6 9.92
103.3 AHC
27R 8 0200
330.3 339.9
9.6 9.94
103.5 AHC
28R 8 0645
339.9 349.5
9.6 8.10
84.4 AHC
29R 8 0845
349.5 359.1
9.6 6.78
70.6 AHC
30R 8 1035
359.1 368.7
9.6 9.75
101.6 AHC
31R 8 1205
368.7 378.3
9.6 9.53
99.3 AHC
32R 8 1340
378.3 387.9
9.6 8.93
93.0 AHC
33R 8 1510
387.9 397.5
9.6 9.16
95.4 AHC
34R 8 1645
397.5 407.1
9.6 8.02
83.5 AHC
35R 8 1815
407.1 416.7
9.6 8.07
84.1 AHC
36R 8 2020
416.7 426.4
9.7 9.91
102.2 AHC
37R 8 2210
426.4 436.0
9.6 9.88
102.9 AHC
38R 8 2350
436.0 445.7
9.7 9.89
102.0 AHC
39R 9 0115
445.7 455.3
9.6 8.95
93.2 AHC
40R 9 0255
455.3 464.9
9.6 10.02
104.4 AHC
41R 9 0420
464.9 474.5
9.6 7.16
74.6 AHC
42R 9 0600
474.5 484.1
9.6 10.03
104.5 AHC
43R 9 0800
484.1 493.7
9.6 6.52
67.9 AHC
44R 9 0935
493.7 503.3
9.6 9.88
102.9 AHC
45R 9 1200
503.3 512.9
9.6 7.06
73.5 AHC
46R 9 1700
512.9 522.1
9.2 6.10
66.3 AHC
47R 9 2240
522.1 531.7
9.6 3.77
39.3 AHC
48R 10 0450
531.7 541.3
9.6 3.51
36.6 AHC
49R 10 1140
541.3 550.3
9.0 2.91
32.3 AHC on first 5 m
50R 10 1630
550.3 554.0
3.7 0.10
2.7 AHC; core catcher jammed
51R 10 2045
554.0 560.7
6.7 0.72
10.8 AHC
52R 11 0340
560.7 570.3
9.6 2.03
21.2 AHC
53R 11 0910
570.3 579.5
9.2 1.16
12.6 AHC
54R 11 1555
579.5 588.1
8.6 2.20
25.6 AHC
55R 11 0000
588.1 600.0
11.9 3.20
26.9 AHC




Cored totals:
519.6 406.79
78.3




Drilled totals:
80.4








Total:
600.0