Hole 1173B | ||||||||||
Latitude: 32°14.6831´N | ||||||||||
Longitude: 135°01.4845´E | ||||||||||
Seafloor (drill pipe measurement from rig floor, mbrf): 4801.9 | ||||||||||
Distance between rig floor and sea level (m): 10.8 | ||||||||||
Water depth (drill pipe measurement from sea level, m): 4791.1 | ||||||||||
Hole 1173C | ||||||||||
Latitude: 32°14.6978´N | ||||||||||
Longitude: 135°01.4612´E | ||||||||||
Seafloor (drill pipe measurement from rig floor, mbrf): 4801.9 | ||||||||||
Distance between rig floor and sea level (m): 10.8 | ||||||||||
Water depth (drill pipe measurement from sea level, m): 4791.1 | ||||||||||
Operation
|
Start
|
End
|
Depth (mbsf)
|
Drilled
(mbsf) |
Time on
hole
|
Comments
|
||||
|
Date
(2001) |
Time
(local) |
Date
(2001) |
Time
(local) |
Top
|
Bottom
|
|
Hours
|
Days
|
|
196-1173B: | ||||||||||
Install reentry cone and 20-in casing | 10 May | 0224 | 13 May | 2315 | 0 | 124.2 | 124.2 | 88.5 | 3.69 | 20-in casing shoe at 120.6 mbsf; includes 43 hr due to reentry cone loss. |
LWD | 13 May | 2315 | 17 May | 2135 | 124.2 | 737.1 | 612.9 | 94.3 | 3.93 | Includes 24 hr spent evading tropical storm. |
Open
9![]() ![]() |
23 May | 1910 | 2 Jun | 0230 | 124.2 | 735.1 | 610.9 | 79.3 | 3.31 | 17![]() |
Assemble and drill in ACORK | 2 Jun | 0230 | 10 Jun | 0445 | — | — | — | 194.2 | 8.09 | ACORK extends from 0 to 727.10 mbsf; includes 58-hr DP transit back to site. |
RCB core below ACORK: Open basement hydrologic system to deepest monitoring zone | 10 Jun | 0445 | 12 Jun | 1615 | 737.1 | 756.6 | 19.5 | 59.5 | 2.48 | Three cores; 19.5 m cored; 5.19 m recovered (27%). |
Install bridge plug inside ACORK | 12 Jun | 1615 | 14 Jun | 0000 | — | — | — | 31.7 | 1.32 | Bridge plug set at 466 mbsf; drill pipe broke off at ACORK head. |
Conduct camera survey of ACORK | 29 Jun | 0400 | 29 Jun | 2215 | — | — | — | 18.3 | 0.76 | |
Totals for Hole 1173B: | 1367.5 | 565.8 | 23.58 | |||||||
196-1173C: | ||||||||||
LWD | 17 May | 2135 | 18 May | 1655 | 0 | 175.0 | 175.0 | 19.4 | 0.81 | |
Totals for Hole 1173C: | 175.0 | 19.4 | 0.81 | |||||||
Totals for Site 1173: | 1542.5 | 585.2 | 24.39 |