Table T1. Coring summary, Hole 1203A. 
Hole 1203A
Latitude: 50°56.9976´N
Longitude: 167°44.3969´E
Time on site (hr): 326.25 (1715 hr, 11 Jul-1630 hr, 25 Jul 2001)
Seafloor (drill pipe measurement from rig floor, mbrf): 2604.4
Distance between rig floor and sea level (m): 10.9
Water depth (drill pipe measurement from sea level, m): 2593.5
Total depth (drill pipe measurement from rig floor, mbrf): 3519.0
Total penetration (meters below seafloor, mbsf): 914.6
Total length of cored section (m): 614.6
Total length of drilled intervals (m): 300.0
Total core recovered (m): 333.91
Core recovery (%): 54.3
Total number of cores: 68
Total number of drilled intervals: 1
Core Date
(Jul
2001)
Ship time (local) Depth (mbsf) Length (m) Recovery (%) Comments
Top
Bottom
Cored
Recovered
197-1203A-









*****Drilled from 0 to 300.0 mbsf*****

1R 12 2300 300.0 309.6 9.6 4.65 48.4
2R 13 0005 309.6 319.3 9.7 5.77 59.5
3R 13 0050 319.3 329.0 9.7 9.06 93.4
4R 13 0135 329.0 338.7 9.7 2.55 26.3
5R 13 0220 338.7 348.4 9.7 3.06 31.6
6R 13 0305 348.4 358.1 9.7 0.23 2.4
7R 13 0345 358.1 367.8 9.7 9.33 96.2
8R 13 0430 367.8 377.5 9.7 8.61 88.8
9R 13 0505 377.5 387.2 9.7 4.05 41.8
10R 13 0555 387.2 396.9 9.7 3.20 33.0
11R 13 0645 396.9 406.6 9.7 5.93 61.1
12R 13 0730 406.6 416.3 9.7 3.88 40.0
13R 13 0815 416.3 426.0 9.7 2.60 26.8
14R 13 0855 426.0 435.7 9.7 4.18 43.1
15R 13 0945 435.7 445.1 9.4 4.37 46.5
16R 13 1030 445.1 454.3 9.2 3.53 38.4
17R 13 1210 454.3 463.8 9.5 4.34 45.7
18R 13 1705 463.8 473.4 9.6 4.22 44.0
19R 13 2305 473.4 483.0 9.6 6.32 65.8
20R 14 0415 483.0 492.6 9.6 7.19 74.9
21R 14 0710 492.6 502.2 9.6 4.71 49.1
22R 14 0935 502.2 511.9 9.7 6.58 67.8
23R 14 1120 511.9 521.5 9.6 3.53 36.8
24R 14 1225 521.5 531.1 9.6 2.26 23.5
25R 14 1450 531.1 534.8 3.7 1.95 52.7
26R 14 1810 534.8 540.8 6.0 4.53 75.5
27R 14 1945 540.8 550.5 9.7 3.11 32.1
28R 14 2145 550.5 560.2 9.7 3.01 31.0
29R 14 2355 560.2 569.8 9.6 6.88 71.7
30R 15 0545 569.8 579.4 9.6 2.67 27.8
31R 15 0900 579.4 589.0 9.6 1.99 20.7
32R 15 1240 589.0 598.6 9.6 6.52 67.9
33R 15 1450 598.6 608.3 9.7 4.03 41.6
34R 15 1810 608.3 612.3 4.0 3.71 92.8
35R 15 2230 612.3 617.9 5.6 5.06 90.4
36R 16 0330 617.9 627.5 9.6 9.63 100.3
37R 16 0610 627.5 637.1 9.6 3.89 40.5
38R 16 0855 637.1 646.6 9.5 6.24 65.7
39R 16 1155 646.6 656.2 9.6 7.42 77.3
40R 16 1630 656.2 665.9 9.7 5.90 60.8
41R 16 2120 665.9 675.5 9.6 9.20 95.8 AHC
42R 17 0155 675.5 685.1 9.6 7.22 75.2 AHC
43R 17 0715 685.1 694.7 9.6 0.65 6.8 AHC
44R 18 0850 694.7 703.1 8.4 7.47 88.9 AHC
45R 18 1420 703.1 712.7 9.6 7.52 78.3 AHC
46R 18 1910 712.7 722.3 9.6 7.02 73.1 AHC
47R 18 2245 722.3 727.1 4.8 4.18 87.1 AHC
48R 19 0435 727.1 732.0 4.9 3.62 73.9 AHC
49R 19 1105 732.0 741.6 9.6 8.66 90.2 AHC
50R 19 1455 741.6 751.2 9.6 0.11 1.2 AHC
51R 19 1940 751.2 760.8 9.6 6.70 69.8 AHC
52R 20 0040 760.8 770.4 9.6 6.72 70.0 AHC
53R 20 0540 770.4 780.0 9.6 6.59 68.7 AHC
54R 20 1200 780.0 789.7 9.7 6.32 65.2 AHC
55R 20 1730 789.7 799.3 9.6 6.20 64.6 AHC
56R 20 2320 799.3 808.9 9.6 5.80 60.4 AHC
57R 21 0400 808.9 814.5 5.6 4.38 78.2 AHC
58R 21 0800 814.5 818.5 4.0 4.10 102.5 AHC
59R 21 1210 818.5 828.1 9.6 5.85 60.9 AHC
60R 21 1550 828.1 837.7 9.6 3.69 38.4 AHC
61R 21 1955 837.7 847.4 9.7 3.41 35.2 AHC
62R 22 0100 847.4 857.0 9.6 3.39 35.3 AHC
63R 22 0450 857.0 866.6 9.6 6.36 66.3 AHC
64R 22 0650 866.6 876.2 9.6 1.90 19.8 AHC
65R 22 1000 876.2 885.8 9.6 3.89 40.5 AHC
66R 22 1355 885.8 895.4 9.6 3.92 40.8 AHC
67R 22 1805 895.4 905.0 9.6 4.56 47.5 AHC
68R 22 2240 905.0 914.6 9.6 3.79 39.5 AHC



Cored totals: 614.6 333.91 54.3



Drilled totals: 300.0





Total: 914.6


Note: AHC = active heave compensation.