Table T1. Coring summary, Site 1204.
Hole 1204A
Latitude: 51°11.6784´N
Longitude: 167°46.3604´E
Time on site (hr): 173.5 (1530 hr, 25 Jul-2100 hr, 1 Aug 2001)
Time on hole (hr): 71.5 (1530 hr, 25 Jul-1500 hr, 28 Jul 2001)
Seafloor (drill pipe measurement from rig floor, mbrf): 2382.0
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level, m): 2371.0
Total depth (drill pipe measurement from rig floor, mbrf): 3262.3
Total penetration (meters below seafloor, mbsf): 880.3
Total length of cored section (m): 118.4
Total length of drilled intervals (m): 761.9
Total core recovered (m): 55.86
Core recovery (%): 47.2
Total number of cores: 14
Total number of drilled intervals: 2
Hole 1204B
Latitude: 51°11.6406´N
Longitude: 167°46.4217´E
Time on hole (hr): 102 (1500 hr, 28 Jul-2100 hr, 1 Aug 2001)
Seafloor (drill pipe measurement from rig floor, mbrf): 2381.0
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level, m): 2370.0
Total depth (drill pipe measurement from rig floor, mbrf): 3335.5
Total penetration (meters below seafloor, mbsf): 954.5
Total length of cored section (m): 143.8
Total length of drilled intervals (m): 810.7
Total core recovered (m): 55.93
Core recovery (%): 38.9
Total number of cores: 17
Total number of drilled intervals: 2
Core Date
(2001)
Ship
time
(local)
Depth (mbsf) Length (m) Recovery
(%)
Comments
Top
Bottom
Cored
Recovered
197-1204A-








*****Drilled from 0.0 to 761.9 mbsf*****

1R 26 Jul 1745 761.9 771.5 9.6 8.71 90.7
2R 26 Jul 1845 771.5 781.1 9.6 4.62 48.1
3R 26 Jul 1945 781.1 790.7 9.6 7.04 73.3
4R 26 Jul 2100 790.7 800.3 9.6 6.13 63.9
5R 26 Jul 2205 800.3 809.9 9.6 5.32 55.4
6R 27 Jul 0010 809.9 819.5 9.6 6.38 66.5
7R 27 Jul 0320 819.5 829.0 9.5 4.71 49.6 AHC
8R 27 Jul 0500 829.0 838.6 9.6 1.51 15.7
9R 27 Jul 0905 838.6 848.3 9.7 3.83 39.5 AHC
10R 27 Jul 1500 848.3 857.9 9.6 7.61 79.3 AHC
11R 27 Jul 2045 857.9 862.7 4.8 0.00 0.0 AHC
12R 27 Jul 2330 862.7 867.5 4.8 0.00 0.0 AHC
13R 28 Jul 0535 867.5 877.1 9.6 0.00 0.0 AHC
14R 28 Jul 0915 877.1 880.3 3.2 0.00 0.0 AHC



Cored totals: 118.4 55.86 47.2



Drilled totals: 761.9






Total: 880.3


197-1204B-








*****Drilled from 0.0 to 810.7 mbsf*****

1R 29 Jul 2035 810.7 820.3 9.6 4.65 48.4 AHC
2R 29 Jul 2355 820.3 829.9 9.6 6.35 66.2 AHC
3R 30 Jul 0300 829.9 839.6 9.7 2.31 23.8 AHC
4R 30 Jul 0530 839.6 849.3 9.7 2.51 25.9 AHC
5R 30 Jul 0745 849.3 858.6 9.3 1.86 20.0 AHC
6R 30 Jul 1040 858.6 868.2 9.6 4.12 42.9 AHC
7R 30 Jul 1355 868.2 877.8 9.6 3.64 37.9 AHC
8R 30 Jul 1815 877.8 887.1 9.3 3.14 33.8 AHC
9R 30 Jul 2115 887.1 888.8 1.7 2.80 164.7 AHC
10R 31 Jul 0125 888.8 896.6 7.8 4.26 54.6 AHC
11R 31 Jul 0650 896.6 906.3 9.7 1.32 13.6 AHC
12R 31 Jul 1720 906.3 908.3 2.0 1.50 75.0 AHC
13R 31 Jul 2305 908.3 915.9 7.6 4.38 57.6 AHC
14R 1 Aug 0310 915.9 925.6 9.7 3.26 33.6 AHC
15R 1 Aug 0635 925.6 935.2 9.6 2.65 27.6 AHC
16R 1 Aug 0910 935.2 944.9 9.7 3.90 40.2 AHC
17R 1 Aug 1550 944.9 954.5 9.6 3.28 34.2 AHC



Cored totals: 143.8 55.93 38.9



Drilled totals: 810.7






Total: 954.5


Note: AHC = active heave compensation.