Table T1. Coring summary, Site 1212.
Hole 1212A
Latitude: 32°26.9000´N
Longitude: 157°42.7016´E
Time on site (hr): 61.5 (1000 hr, 29 Sep-2330 hr, 1 Oct 2001)
Time on hole (hr): 29 (1000 hr, 29 Sep-1500 hr, 30 Sep 2001)
Seafloor (drill pipe measurement from rig floor, mbrf): 2693.6
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 2682.5
Total depth (drill pipe measurement from rig floor, mbrf): 2795.2
Total penetration (mbsf): 101.6
Total length of cored section (m): 101.6
Total core recovered (m): 116.9
Core recovery (%): 115.1
Total number of cores: 13
Total number of drilled intervals: 0
Hole 1212B
Latitude: 32°26.9070´N
Longitude: 157°42.7002´E
Time on hole (hr): 32.5 (1500 hr, 29 Sep-2330 hr, 1 Oct 2001)
Seafloor (drill pipe measurement from rig floor, mbrf): 2691.8
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 2680.6
Total depth (drill pipe measurement from rig floor, mbrf): 2899.4
Total penetration (mbsf): 207.6
Total length of cored section (m): 192.8
Total core recovered (m): 180.5
Core recovery (%): 93.6
Total number of cores: 27
Total number of drilled intervals: 10
Core Date (2001) Local time
(hr)
Depth (mbsf) Length (m) Recovery (%)
Top
Bottom
Cored
Recovered
198-1212A-





1H 29 Sep 1555 0.0 4.9 4.9 4.96 101.2
2H 29 Sep 1645 4.9 14.4 9.5 9.94 104.6
3H 29 Sep 1729 14.4 23.9 9.5 9.99 105.2
4H 29 Sep 1815 23.9 33.4 9.5 10.07 106.0
5H 29 Sep 1900 33.4 42.9 9.5 10.02 105.5
6H 29 Sep 1950 42.9 47.4 4.5 6.53 145.1
7H 29 Sep 2035 47.4 56.9 9.5 10.06 105.9
8H 29 Sep 2120 56.9 66.4 9.5 9.64 101.5
9H 29 Sep 2205 66.4 75.9 9.5 9.66 101.7
10H 29 Sep 2250 75.9 85.4 9.5 10.03 105.6
11H 29 Sep 2340 85.4 89.9 4.5 6.85 152.2
12H 30 Sep 0030 89.9 99.4 9.5 9.94 104.6
13H 30 Sep 0140 99.4 101.6 2.2 9.25 420.5



Cored totals: 101.6 116.94 115.1
198-1212B-





1H 30 Sep 0400 0.0 6.7 6.7 6.74 100.6
2H 30 Sep 0440 6.7 16.2 9.5 10.04 105.7
3H 30 Sep 0530 16.2 25.7 9.5 9.86 103.8
4H 30 Sep 0615 25.7 35.2 9.5 10.02 105.5
5H 30 Sep 0700 35.2 44.7 9.5 10.04 105.7
6H 30 Sep 0745 44.7 54.2 9.5 10.03 105.6
7H 30 Sep 0825 54.2 63.7 9.5 9.77 102.8
8H 30 Sep 0920 63.7 73.2 9.5 9.75 102.6
9H 30 Sep 1005 73.2 82.7 9.5 9.99 105.2
10H 30 Sep 1050 82.7 92.2 9.5 9.80 103.2
11H 30 Sep 1145 92.2 101.7 9.5 9.70 102.1
12H 30 Sep 1225 101.7 111.2 9.5 9.81 103.3
13H 30 Sep 1355 111.2 120.7 9.5 9.73 102.4
14H 30 Sep 1435 120.7 120.8 0.1 0.03 30.0
*****Drilled from 120.8 to 121.5 mbsf*****
15H 30 Sep 1615 121.5 131.0 9.5 7.12 74.9
16H 30 Sep 1735 131.0 135.2 4.2 0.00 0.0
*****Drilled from 135.2 to 136.2 mbsf*****
*****Drilled from 136.2 to 136.4 mbsf*****
*****Drilled from 136.4 to 137.2 mbsf*****
17H 1 Oct 0150 137.2 143.7 6.5 6.43 98.9
18H 1 Oct 0245 143.7 153.2 9.5 9.11 95.9
19H 1 Oct 0415 153.2 162.7 9.5 9.64 101.5
20H 1 Oct 0630 162.7 172.2 9.5 6.33 66.6
21H 1 Oct 0730 172.2 173.2 1.0 1.38 138.0
*****Drilled from 173.2 to 175.2 mbsf*****
22H 1 Oct 0905 175.2 182.7 7.5 1.38 18.4
*****Drilled from 182.7 to 183.7 mbsf*****
23H 1 Oct 1025 183.7 189.0 5.3 4.41 83.2
*****Drilled from 189.0 to 190.0 mbsf*****
24H 1 Oct 1200 190.0 196.3 6.3 7.66 121.6
*****Drilled from 196.3 to 199.3 mbsf*****
25H 1 Oct 1350 199.3 201.0 1.7 0.63 37.1
*****Drilled from 201.0 to 203.5 mbsf*****
26H 1 Oct 1525 203.5 204.5 1.0 0.80 80.0
*****Drilled from 204.5 to 207.1 mbsf*****
27H 1 Oct 1655 207.1 207.6 0.5 0.30 60.0



Cored totals: 192.8 180.50 93.6



Drilled total: 14.8




Total: 207.6