Date
(Nov 2001) |
Local time
(hr) |
Operations
|
---|---|---|
16 | 1130 | Hole preparation complete, rig up wireline |
|
1700 | Run into hole with triple combo (MGT, HNGS, APS, HLDT, DITE, TAP) |
|
2210 | Uplog with triple combo at 900 ft/hr from total depth (279 mbsf) |
|
2250 | Going down for a second pass |
|
2330 | Uplog with triple combo at 900 ft/hr from total depth (279 mbsf) |
17 | 0010 | Going down for an MGT pass |
|
0050 | Uplog with MGT at 700 ft/hr from total depth (247 mbsf) |
|
0140 | Pull tools out of hole and rigdown |
|
0630 | Rig up FMS-sonic |
|
0740 | Run into hole with FMS-sonic (NGT, DSI, GPIT, FMS) |
|
1230 | Uplog with FMS-sonic at 900 ft/hr from total depth (281.2 mbsf) |
|
1310 | Going down for a second pass |
|
1400 | Uplog with FMS-sonic at 900 ft/hr from total depth (280 mbsf) |
|
1445 | Pipe withdrawal and extra 20 m uplogging |
|
1455 | Pull tools out of hole and rig down |
|
1900 | End of logging operations |
Notes: Drillers total depth = 5098 mbsf, water depth = 4817 m, initial end of pipe = 80.0 mbsf, final end of pipe = 60.0 mbsf. MGT = multisensor gamma ray tool, HNGS = hostile environment natural gamma ray sonde, APS = accelerator porosity sonde, DITE = dual induction tool, TAP = high-temperature acceleration pressure tool, FMS = Formation MicroScanner, NGT = natural gamma ray tool, DSI = dipole sonic induction tool, GPIT = general purpose inclinometry tool.