Table T1. Coring summary, Site 1219. 
Hole 1219A
Latitude: 7°48.0097´N
Longitude: 142°0.9390´W
Time on site (hr): 122.75 (0200 hr, 23 Nov-0445 hr, 28 Nov 2001)
Time on hole (hr): 82.42 (0200 hr, 23 Nov-1225 hr, 26 Nov 2001)
Seafloor (drill pipe measurement from rig floor, mbrf): 5074.5
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 5063.3
Total depth (drill pipe measurement from rig floor, mbrf): 5325.3
Total penetration (meters below seafloor, mbsf): 250.8
Total length of cored section (m): 250.8
Total core recovered (m): 240.41
Core recovery (%): 95.7
Total number of cores: 27
Total number of drilled intervals: 0
Hole 1219B
Latitude: 7°48.0186´N
Longitude: 142°0.9397´W
Time on hole (hr): 40.33 (1225 hr, 26 Nov-0445 hr, 28 Nov 2001)
Seafloor (drill pipe measurement from rig floor, mbrf): 5074.5
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 5063.3
Total depth (drill pipe measurement from rig floor, mbrf): 5232.5
Total penetration (meters below seafloor, mbsf): 158.0
Total length of cored section (m): 137.0
Total length of drilled intervals (m): 21.0
Total core recovered (m): 138.55
Core recovery (%): 101.1
Total number of cores: 15
Total number of drilled intervals: 1
Core
Date
(Nov 2001)
Local time
(hr)
Depth (mbsf)
Length (m)
Recovery
(%)
Top
Bottom
Cored
Recovered








119-1219A-





1H 23 1230 0.0 6.0 6.0 5.95 99.2
2H 23 1345 6.0 15.5 9.5 10.04 105.7
3H 23 1455 15.5 25.0 9.5 9.85 103.7
4H 23 1620 25.0 34.5 9.5 9.87 103.9
5H 23 1740 34.5 44.0 9.5 9.97 105.0
6H 23 1925 44.0 53.5 9.5 9.95 104.7
7H 23 2035 53.5 63.0 9.5 9.49 99.9
8H 23 2140 63.0 72.5 9.5 10.09 106.2
9H 23 2245 72.5 82.0 9.5 9.89 104.1
10H 24 0010 82.0 91.5 9.5 9.62 101.3
11H 24 0110 91.5 101.0 9.5 9.69 102.0
12H 24 0220 101.0 110.5 9.5 10.14 106.7
13H 24 0320 110.5 120.0 9.5 9.63 101.4
14H 24 0430 120.0 129.5 9.5 10.01 105.4
15H 24 0550 129.5 139.0 9.5 9.77 102.8
16H 24 0800 139.0 148.5 9.5 9.94 104.6
17H 24 0935 148.5 158.0 9.5 9.81 103.3
18H 24 1040 158.0 167.5 9.5 10.02 105.5
19H 24 1200 167.5 177.0 9.5 9.51 100.1
20H 24 1330 177.0 186.5 9.5 9.93 104.5
21H 24 1450 186.5 196.0 9.5 9.85 103.7
22H 24 1615 196.0 205.5 9.5 9.84 103.6
23H 24 1745 205.5 215.0 9.5 9.97 105.0
24H 24 1920 215.0 224.5 9.5 9.91 104.3
25X 24 2200 224.5 234.1 9.6 2.45 25.5
26X 25 0130 234.1 243.7 9.6 4.00 41.7
27X 25 0450 243.7 250.8 7.1 1.22 17.2



Cored totals: 250.8 240.41 95.7








199-1219B-








***** Drilled from 0.0 to 21.0 mbsf *****
2H 26 1530 21.0 30.5 9.5 9.95 104.7
3H 26 1655 30.5 40.0 9.5 9.18 96.6
4H 26 1845 40.0 49.5 9.5 8.75 92.1
5H 26 1955 49.5 59.0 9.5 9.29 97.8
6H 26 2105 59.0 68.5 9.5 9.97 105.0
7H 26 2245 68.5 78.0 9.5 9.80 103.2
8H 26 2350 78.0 87.5 9.5 10.10 106.3
9H 27 0100 87.5 97.0 9.5 9.50 100.0
10H 27 0220 97.0 106.5 9.5 9.81 103.3
11H 27 0345 106.5 116.0 9.5 9.88 104.0
12H 27 0500 116.0 125.5 9.5 9.88 104.0
13H 27 0615 125.5 135.0 9.5 9.68 101.9
14H 27 0730 135.0 144.5 9.5 10.13 106.6
15H 27 1020 144.5 154.0 9.5 8.68 91.4
16H 28 0200 154.0 158.0 4.0 3.95 98.8



Cored totals: 137.0 138.55 101.1



Drilled total: 21.0





Total: 158.0

Note: The expanded coring summary table is available in ASCII (see the "Supplementary Material" contents list).