Date
(Nov 2001) |
Local time
(hr) |
Operations
|
---|---|---|
|
|
|
25 | 0945 | Hole preparation complete, rig up wireline |
|
1215 | Run into hole with triple combo (MGT, HNGS, APS, HLDT, DITE, TAP) |
|
1530 | Uplog with triple combo at 900 ft/hr from total depth (254 mbsf) |
|
1635 | Going down for a second pass |
|
1645 | Uplog with triple combo at 900 ft/hr from total depth (254 mbsf) |
|
1745 | Going down for an MGT pass |
|
1805 | Uplog with MGT at 700 ft/hr from total depth (224 mbsf) |
|
1850 | Going down for second pass |
|
1900 | Uplog with MGT at 700 ft/hr from total depth (223 mbsf) |
|
2350 | Pull tools out of hole and rigdown |
26 | 0000 | Rig up FMS-sonic |
|
0245 | Run into hole with FMS-sonic (NGT, DSI, GPIT, FMS) |
|
0600 | Uplog with FMS-sonic at 900 ft/hr from total depth (254 mbsf) |
|
0645 | Going down for a second pass |
|
0705 | Uplog with FMS-sonic at 900 ft/hr from total depth (254 mbsf) |
|
1200 | Pull tools out of hole and rig down |
|
1200 | End of logging operations |
Notes: Drillers total depth = 5325 mbsf, water depth = 5074 m, end of pipe = 82.0 mbsf. MGT = multisensor gamma ray tool, HNGS = hostile environment natural gamma ray sonde, APS = accelerator porosity sonde, HLDT = hostile environment lithodensity tool, DITE = dual induction tool, TAP = high-temperature acceleration pressure tool, FMS = Formation MicroScanner, NGT = natural gamma ray tool, DSI = dipole sonic induction tool, GPIT = general purpose inclinometry tool.