Activity
|
Time
(days) |
In port: | 4.26 |
Underway (includes survey): | 9.31 |
Drilling operations: |
|
Coring | 9.09 |
Drilling | 2.53 |
Pipe trips | 6.88 |
Logging | 1.60 |
Waiting on weather | 6.11 |
Other | 2.19 |
Total: | 28.40 |
Total (16 Dec 2001 to 27 Jan 2002): | 41.97 |