Table T3. Time distribution, Leg 200.
Activity
Time
(days)
In port: 4.26
Underway (includes survey): 9.31
Drilling operations:
Coring 9.09
Drilling 2.53
Pipe trips 6.88
Logging 1.60
Waiting on weather 6.11
Other 2.19
Total: 28.40
Total (16 Dec 2001 to 27 Jan 2002): 41.97