Table T2. Summary of pressure coring sampler operations, Leg 201.
Run
Core
Date (2002)
Depth (mbsf)
Recovered (m)
Pressure (psi)
Gas volume
Comments

201-





1 1225A-29P 10-Feb 262.2 0.41 1200 70 mL
2 1225C-32P 13-Feb 293.8 1.00 4800 70 mL
3 1226B-42P 22-Feb 378.0 0.66 6200 60 mL
4 1226E-21P 25-Feb 378.0 1.02 0
Chert prevented ball valve from closing
5 1227A-15P 1-Mar 129.1 0.00 0
Actuation mechanism failed
6 1228A-23P 5-Mar 198.9 0.07 35 60 mL Cutting shoe lost in hole
7 1229D-10P 9-Mar 77.8 0.86 400 2.88 L
8 1230A-7P 12-Mar 52.3 1.00 6278 1.16 L
9 1230A-16P 13-Mar 127.3 1.00 7794 3.11 L
10 1230A-20P 13-Mar 156.8 0.65 5930 6.33 L
11 1230A-25P 14-Mar 196.8 0.18 8050 0.200 L
12 1230A-36P 15-Mar 254.6 0.41 8086 1.16 L
13 1230A-39P 15-Mar 276.8 0.62 280 1.53 L
14 1230B-4P 17-Mar 22.0 1.00 7400 0.775 L
15 1230B-10P 17-Mar 71.5 1.00 7416 1.14 L
16 1230B-14P 18-Mar 103.0 1.00 8030 1.765 L
17 1230E-5P 18-Mar 34.0 1.00 6134 0.26 L