Table T9. Detail of logging operations, Hole 1225A.
Date
(Feb 2002)
UTC
(GMT - 7 hr)
Tool depth
(mbsf)
Remarks
10 1930
Last core on deck
10 1930-2030
Hole swept with 20 bbl of sepiolite mud
10 2030-2200
Wiper trip up to 80 mbsf, back down to 291 mbsf
10 2200-2300
Hole displaced with 130 bbl of sepiolite mud
10 2300-2400
Set back top drive; bottom of pipe put at 80 mbsf
11 0030
Start logging rig-up
11 0300
Start going downward with triple combination tool string: TAP/DIT-E/HLDT/APS/HNGS/SGT
11 0442 0 Stop 5 min at mudline for temperature calibration
11 0454 80 Tool string in open hole
11 0510 323 Tool at TD; start logging upward at 900 ft/hr
11 0604 80 Tool back into pipe; speed up to 1500 ft/hr to log mudline
11 0617 -22 End of pass 1; standing 5 min and start going back downward
11 0641 323 Tool at TD; start logging upward pass 2 at 900 ft/hr
11 0715 175 End of pass 2; speed up tool to 6000 ft/hr
11 0925 0 Tool back on rig floor
11 1045
Finish rig-down

Notes: UTC = Universal Time Coordinated. TD = total depth. TAP = LDEO Temperature/Acceleration/Pressure tool, DIT-E = Dual Induction Tool, HLDT = Hostile Environment Litho-Density Tool, APS = Accelerator Porosity Sonde, HNGS = Hostile Environment Gamma Ray Sonde, SGT = Scintillation Gamma Ray Tool.