Table T1. Coring summary, Site 1227. 
Hole 1227A
Latitude: 8°59.4631´S
Longitude: 79°57.3499´W
Time on site (hr): 61.75 (1300 hr, 28 Feb-0245 hr, 3 Mar 2002)
Time on hole (hr): 40.83 (1300 hr, 28 Feb-0550 hr, 2 Mar 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 438.9
Distance between rig floor and sea level (m): 11.4
Water depth (drill pipe measurement from sea level, m): 427.5
Total depth (drill pipe measurement from rig floor, mbrf): 590.0
Total penetration (meters below seafloor, mbsf): 151.1
Total length of cored section (m): 151.1
Total core recovered (m): 100.51
Core recovery (%): 66.5
Total number of cores: 18
Hole 1227B
Latitude: 8°59.4528´S
Longitude: 79°57.3503´W
Time on hole (hr): 2.67 (0550 hr, 2 Mar-0830 hr, 2 Mar 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 438.5
Distance between rig floor and sea level (m): 11.4
Water depth (drill pipe measurement from sea level, m): 427.1
Total depth (drill pipe measurement from rig floor, mbrf): 462.5
Total penetration (meters below seafloor, mbsf): 24.0
Total length of cored section (m): 24.0
Total core recovered (m): 24.67
Core recovery (%): 102.8
Total number of cores: 3
Hole 1227C
Latitude: 8°59.4468´S
Longitude: 79°57.3475´W
Time on hole (hr): 1.33 (0830 hr, 2 Mar-0950 hr, 2 Mar 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 437.7
Distance between rig floor and sea level (m): 11.4
Water depth (drill pipe measurement from sea level, m): 426.3
Total depth (drill pipe measurement from rig floor, mbrf): 464.5
Total penetration (meters below seafloor, mbsf): 26.8
Total length of cored section (m): 26.8
Total core recovered (m): 27.25
Core recovery (%): 101.7
Total number of cores: 3
Hole 1227D
Latitude: 8°59.4474´S
Longitude: 79°57.3613´W
Time on hole (hr): 11.92 (0950 hr, 2 Mar-2145 hr, 2 Mar 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 438.0
Distance between rig floor and sea level (m): 11.4
Water depth (drill pipe measurement from sea level, m): 426.6
Total depth (drill pipe measurement from rig floor, mbrf): 512.0
Total penetration (meters below seafloor, mbsf): 74.0
Total length of cored section (m): 74.0
Total core recovered (m): 54.84
Core recovery (%): 74.1
Total number of cores: 8
Hole 1227E
Latitude: 8° 59.4416´S
Longitude: 79°57.3598´W
Time on hole (hr): 5 (2145 hr, 2 Mar-0245 hr, 3 Mar 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 438.6
Distance between rig floor and sea level (m): 11.4
Water depth (drill pipe measurement from sea level, m): 427.2
Total depth (drill pipe measurement from rig floor, mbrf): 465.5
Total penetration (meters below seafloor, mbsf): 26.0
Total length of cored section (m): 26.9
Total core recovered (m): 26.72
Core recovery (%): 99.33
Total number of cores: 4
Core
Date
(2002)
Local time
(hr)
Depth (mbsf)
Length (m)
Recovery
(%)
Top
Bottom
Cored
Recovered
201-1227A-





1H 28 Feb 1805 0.0 5.6 5.6 5.59 99.8
2H 28 Feb 1915 5.6 15.1 9.5 9.81 103.3
3H 28 Feb 2130 15.1 24.6 9.5 9.86 103.8
4H 1 Mar 0055 24.6 34.1 9.5 10.97 115.5
5H 1 Mar 0245 34.1 43.6 9.5 9.74 102.5
6H 1 Mar 0415 43.6 53.1 9.5 6.47 68.1
7H 1 Mar 0625 53.1 62.6 9.5 3.72 39.2
8H 1 Mar 0825 62.6 72.1 9.5 0.38 4.0
9H 1 Mar 1035 72.1 81.6 9.5 6.48 68.2
10H 1 Mar 1300 81.6 91.1 9.5 7.36 77.5
11H 1 Mar 1500 91.1 100.6 9.5 4.45 46.8
12H 1 Mar 1700 100.6 110.1 9.5 7.00 73.7
13H 1 Mar 1930 110.1 119.6 9.5 7.26 76.4
14H 1 Mar 2030 119.6 129.1 9.5 3.82 40.2
15P 1 Mar 2140 129.1 131.1 2.0 0.00 0.0
16M 1 Mar 2245 131.1 132.1 1.0 0.15 15.0
17H 2 Mar 0050 132.1 141.6 9.5 1.63 17.2
18H 2 Mar 0415 141.6 151.1 9.5 5.82 61.3



Cored totals: 151.1 100.51 66.5
201-1227B-





1H 2 Mar 0705 0.0 5.0 5.0 5.04 100.8
2H 2 Mar 0725 5.0 14.5 9.5 9.98 105.1
3H 2 Mar 0755 14.5 24.0 9.5 9.65 101.6



Cored totals: 24.0 24.67 102.8
201-1227C-





1H 2 Mar 0850 0.0 7.8 7.8 7.77 99.6
2H 2 Mar 0905 7.8 17.3 9.5 9.48 99.8
3H 2 Mar 0935 17.3 26.8 9.5 10.00 105.3



Cored totals: 26.8 27.25 101.7
201-1227D-





1H 2 Mar 1115 0.0 7.5 7.5 7.53 100.4
2H 2 Mar 1140 7.5 17.0 9.5 9.14 96.2
3H 2 Mar 1215 17.0 26.5 9.5 9.97 105.0
4H 2 Mar 1250 26.5 36.0 9.5 9.87 103.9
5H 2 Mar 1625 36.0 45.5 9.5 7.38 77.7
6H 2 Mar 1825 45.5 55.0 9.5 9.15 96.3
7H 2 Mar 1935 55.0 64.5 9.5 0.10 1.1
8H 2 Mar 2030 64.5 74.0 9.5 1.70 17.9



Cored totals: 74.0 54.84 74.1
201-1227E-





1H 2 Mar 2215 0.0 6.9 6.9 6.90 100.0
2H 2 Mar 2235 6.9 16.4 9.5 9.63 101.4
3H 2 Mar 2300 16.4 25.9 9.5 9.75 102.6
4M 2 Mar 2350 25.9 26.9 1.0 0.44 44.0



Cored totals: 26.9 26.72 99.3