Hole 1227A |
Latitude: 8°59.4631´S |
Longitude: 79°57.3499´W |
Time on site (hr): 61.75 (1300 hr, 28 Feb-0245 hr, 3 Mar 2002) |
Time on hole (hr): 40.83 (1300 hr, 28 Feb-0550 hr, 2 Mar 2002) |
Seafloor (drill pipe measurement from rig floor, mbrf): 438.9 |
Distance between rig floor and sea level (m): 11.4 |
Water depth (drill pipe measurement from sea level, m): 427.5 |
Total depth (drill pipe measurement from rig floor, mbrf): 590.0 |
Total penetration (meters below seafloor, mbsf): 151.1 |
Total length of cored section (m): 151.1 |
Total core recovered (m): 100.51 |
Core recovery (%): 66.5 |
Total number of cores: 18 |
Hole 1227B |
Latitude: 8°59.4528´S |
Longitude: 79°57.3503´W |
Time on hole (hr): 2.67 (0550 hr, 2 Mar-0830 hr, 2 Mar 2002) |
Seafloor (drill pipe measurement from rig floor, mbrf): 438.5 |
Distance between rig floor and sea level (m): 11.4 |
Water depth (drill pipe measurement from sea level, m): 427.1 |
Total depth (drill pipe measurement from rig floor, mbrf): 462.5 |
Total penetration (meters below seafloor, mbsf): 24.0 |
Total length of cored section (m): 24.0 |
Total core recovered (m): 24.67 |
Core recovery (%): 102.8 |
Total number of cores: 3 |
Hole 1227C |
Latitude: 8°59.4468´S |
Longitude: 79°57.3475´W |
Time on hole (hr): 1.33 (0830 hr, 2 Mar-0950 hr, 2 Mar 2002) |
Seafloor (drill pipe measurement from rig floor, mbrf): 437.7 |
Distance between rig floor and sea level (m): 11.4 |
Water depth (drill pipe measurement from sea level, m): 426.3 |
Total depth (drill pipe measurement from rig floor, mbrf): 464.5 |
Total penetration (meters below seafloor, mbsf): 26.8 |
Total length of cored section (m): 26.8 |
Total core recovered (m): 27.25 |
Core recovery (%): 101.7 |
Total number of cores: 3 |
Hole 1227D |
Latitude: 8°59.4474´S |
Longitude: 79°57.3613´W |
Time on hole (hr): 11.92 (0950 hr, 2 Mar-2145 hr, 2 Mar 2002) |
Seafloor (drill pipe measurement from rig floor, mbrf): 438.0 |
Distance between rig floor and sea level (m): 11.4 |
Water depth (drill pipe measurement from sea level, m): 426.6 |
Total depth (drill pipe measurement from rig floor, mbrf): 512.0 |
Total penetration (meters below seafloor, mbsf): 74.0 |
Total length of cored section (m): 74.0 |
Total core recovered (m): 54.84 |
Core recovery (%): 74.1 |
Total number of cores: 8 |
Hole 1227E |
Latitude: 8° 59.4416´S |
Longitude: 79°57.3598´W |
Time on hole (hr): 5 (2145 hr, 2 Mar-0245 hr, 3 Mar 2002) |
Seafloor (drill pipe measurement from rig floor, mbrf): 438.6 |
Distance between rig floor and sea level (m): 11.4 |
Water depth (drill pipe measurement from sea level, m): 427.2 |
Total depth (drill pipe measurement from rig floor, mbrf): 465.5 |
Total penetration (meters below seafloor, mbsf): 26.0 |
Total length of cored section (m): 26.9 |
Total core recovered (m): 26.72 |
Core recovery (%): 99.33 |
Total number of cores: 4 |
Core
|
Date
(2002) |
Local time
(hr) |
Depth (mbsf)
|
Length (m)
|
Recovery
(%) |
||
---|---|---|---|---|---|---|---|
Top
|
Bottom
|
Cored
|
Recovered
|
||||
201-1227A- |
|
|
|
|
|
|
|
1H | 28 Feb | 1805 | 0.0 | 5.6 | 5.6 | 5.59 | 99.8 |
2H | 28 Feb | 1915 | 5.6 | 15.1 | 9.5 | 9.81 | 103.3 |
3H | 28 Feb | 2130 | 15.1 | 24.6 | 9.5 | 9.86 | 103.8 |
4H | 1 Mar | 0055 | 24.6 | 34.1 | 9.5 | 10.97 | 115.5 |
5H | 1 Mar | 0245 | 34.1 | 43.6 | 9.5 | 9.74 | 102.5 |
6H | 1 Mar | 0415 | 43.6 | 53.1 | 9.5 | 6.47 | 68.1 |
7H | 1 Mar | 0625 | 53.1 | 62.6 | 9.5 | 3.72 | 39.2 |
8H | 1 Mar | 0825 | 62.6 | 72.1 | 9.5 | 0.38 | 4.0 |
9H | 1 Mar | 1035 | 72.1 | 81.6 | 9.5 | 6.48 | 68.2 |
10H | 1 Mar | 1300 | 81.6 | 91.1 | 9.5 | 7.36 | 77.5 |
11H | 1 Mar | 1500 | 91.1 | 100.6 | 9.5 | 4.45 | 46.8 |
12H | 1 Mar | 1700 | 100.6 | 110.1 | 9.5 | 7.00 | 73.7 |
13H | 1 Mar | 1930 | 110.1 | 119.6 | 9.5 | 7.26 | 76.4 |
14H | 1 Mar | 2030 | 119.6 | 129.1 | 9.5 | 3.82 | 40.2 |
15P | 1 Mar | 2140 | 129.1 | 131.1 | 2.0 | 0.00 | 0.0 |
16M | 1 Mar | 2245 | 131.1 | 132.1 | 1.0 | 0.15 | 15.0 |
17H | 2 Mar | 0050 | 132.1 | 141.6 | 9.5 | 1.63 | 17.2 |
18H | 2 Mar | 0415 | 141.6 | 151.1 | 9.5 | 5.82 | 61.3 |
|
|
|
Cored totals: | 151.1 | 100.51 | 66.5 | |
201-1227B- |
|
|
|
|
|
|
|
1H | 2 Mar | 0705 | 0.0 | 5.0 | 5.0 | 5.04 | 100.8 |
2H | 2 Mar | 0725 | 5.0 | 14.5 | 9.5 | 9.98 | 105.1 |
3H | 2 Mar | 0755 | 14.5 | 24.0 | 9.5 | 9.65 | 101.6 |
|
|
|
Cored totals: | 24.0 | 24.67 | 102.8 | |
201-1227C- |
|
|
|
|
|
|
|
1H | 2 Mar | 0850 | 0.0 | 7.8 | 7.8 | 7.77 | 99.6 |
2H | 2 Mar | 0905 | 7.8 | 17.3 | 9.5 | 9.48 | 99.8 |
3H | 2 Mar | 0935 | 17.3 | 26.8 | 9.5 | 10.00 | 105.3 |
|
|
|
Cored totals: | 26.8 | 27.25 | 101.7 | |
201-1227D- |
|
|
|
|
|
|
|
1H | 2 Mar | 1115 | 0.0 | 7.5 | 7.5 | 7.53 | 100.4 |
2H | 2 Mar | 1140 | 7.5 | 17.0 | 9.5 | 9.14 | 96.2 |
3H | 2 Mar | 1215 | 17.0 | 26.5 | 9.5 | 9.97 | 105.0 |
4H | 2 Mar | 1250 | 26.5 | 36.0 | 9.5 | 9.87 | 103.9 |
5H | 2 Mar | 1625 | 36.0 | 45.5 | 9.5 | 7.38 | 77.7 |
6H | 2 Mar | 1825 | 45.5 | 55.0 | 9.5 | 9.15 | 96.3 |
7H | 2 Mar | 1935 | 55.0 | 64.5 | 9.5 | 0.10 | 1.1 |
8H | 2 Mar | 2030 | 64.5 | 74.0 | 9.5 | 1.70 | 17.9 |
|
|
|
Cored totals: | 74.0 | 54.84 | 74.1 | |
201-1227E- |
|
|
|
|
|
|
|
1H | 2 Mar | 2215 | 0.0 | 6.9 | 6.9 | 6.90 | 100.0 |
2H | 2 Mar | 2235 | 6.9 | 16.4 | 9.5 | 9.63 | 101.4 |
3H | 2 Mar | 2300 | 16.4 | 25.9 | 9.5 | 9.75 | 102.6 |
4M | 2 Mar | 2350 | 25.9 | 26.9 | 1.0 | 0.44 | 44.0 |
|
|
|
Cored totals: | 26.9 | 26.72 | 99.3 |