Table T10. Detail of logging operations, Hole 1228A.
Date
(Mar 2002)
UTC
(GMT - 7 hr)
Tool depth
(mbsf)
Remarks
5 1300
End of coring
5 1300-1715
Wiper trip; hole displaced with 100 bbl of sepiolite; bottom of pipe set at 80 mbsf
5 1715-1900
Logging rig-up
5 1930
Start going downward with triple combination tool string: TAP/DIT-E/HLDT/APS/HNGS/SGT
5 2000 0 Stop 5 min at mudline for temperature calibration
5 2010 80 Tool string in open hole
5 2025 201 Tool at TD; start logging upward at 900 ft/hr
5 2040
Pipe raised by 10 m
5 2045 70 Tool back inside pipe; speed up to 1500 ft/hr to log mudline
5 2100 0 Mudline indicated by gamma ray at 276 m below rig floor
5 2105 -21 End of pass 1; standing 5 min and start going back downward
5 2115 70 Tool string in open hole
5 2125 201 Tool at TD; start logging upward pass 2 at 900 ft/hr
5 2155 70 Tool back inside pipe
5 2200 51 End of pass 2; speed up to 8000 ft/hr
5 2225 0 Tool back on rig floor
5 2400
Finish rig-down

Notes: UTC = Universal Time Coordinated. TD = total depth. TAP = LDEO Temperature/Acceleration/Pressure tool, DIT-E = Dual Induction Tool, HLDT = Hostile Environment Litho-Density Tool, APS = Accelerator Porosity Sonde, HNGS = Hostile Environment Gamma Ray Sonde, SGT = Scintillation Gamma Ray Tool.