Table T10. Detail of logging operations, Hole 1229A.
Date
(Mar 2002)
UTC
(GMT - 6 hr)
Tool depth
(mbsf)
Remarks
8 0500
End of coring
8 0530-0830
Wiper trip; hole displaced with sepiolite; bottom of pipe set at 80 mbsf
8 0830-1015
Logging rig-up
8 1030
Start going downward with triple combination tool string: TAP/DIT-E/HLDT/APS/HNGS/SGT
8 1040 0 Stop 5 min at mudline for temperature calibration
8 1105 80 Tool string in open hole
8 1115 187 Tool at TD; start logging upward at 900 ft/hr
8 1130
Pipe raised by 10 m
8 1142 70 Tool back inside pipe; speed up to 1500 ft/hr to log mudline
8 1150 0 Mudline indicated by gamma ray at 164 m below rig floor
8 1152 -19 End of pass 1; standing 5 min and start going back downward
8 1200 70 Tool string in open hole
8 1212 201 Tool at TD; start logging upward pass 2 at 900 ft/hr
8 1240 70 Tool back inside pipe
8 1242 47 End of pass 2; speed up to 8000 ft/hr
8 1310
Tool back on rig floor
8 1430
Finish rig-down

Notes: UTC = Universal Time Coordinated. GMT = Greenwich Mean Time. TD = total depth. TAP = LDEO Temperature/Acceleration/Pressure tool, DIT-E = Dual Induction Tool, HLDT = Hostile Environment Litho-Density Tool, APS = Accelerator Porosity Sonde, HNGS = Hostile Environment Gamma Ray Sonde, SGT = Scintillation Gamma Ray Tool.