
Figure F3. Schematic cross section and end view of the APC piston containing the TPC tool. The end view of the APC piston face shows the arrangement of the TPC sensors. TP = thermistor probe, CS = conductivity sensor, PP = pressure port, DP = data dump port. The data dump port is sealed during deployment but is available for data downloads on the drillship catwalk.

