Table T1. Coring summary, Site 1244.
Hole 1244A
Latitude: 44°35.1701´N
Longitude: 125°7.1906´W
Time on site (hr): 204.50 (1415 hr, 12 Jul-1900 hr, 12 July 2002)
Time on hole (hr): 10.75 (1415 hr, 12 Jul-0100 hr, 13 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 907.6
Distance between rig floor and sea level (m): 10.9
Water depth (drill pipe measurement from sea level, m): 896.7
Total depth (drill pipe measurement from rig floor, mbrf): 917.5
Total penetration (meters below seafloor, mbsf): 9.5
Total number of cores: 1
Total number of drilled intervals: 0
Total length of cored section (m): 9.5
Total core recovered (m): 9.99
Core recovery (%): 105.2
Hole 1244B
Latitude: 44°35.1702´N
Longitude: 125°7.1917´W
Time on hole (hr): 11.75 (0100 hr, 13 Jul-1245 hr, 13 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 906.8
Distance between rig floor and sea level (m): 10.8
Water depth (drill pipe measurement from sea level, m): 896.0
Total depth (drill pipe measurement from rig floor, mbrf): 961
Total penetration (meters below seafloor, mbsf): 54.1
Total number of cores: 6
Total number of drilled intervals: 0
Total length of cored section (m): 54.1
Total core recovered (m): 56.85
Core recovery (%): 105.1
Hole 1244C
Latitude: 44°35.1784´N
Longitude: 125°7.1902´W
Time on hole (hr): 64.75 (1245 hr, 13 Jul-0530 hr, 16 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 906.0
Distance between rig floor and sea level (m): 10.9
Water depth (drill pipe measurement from sea level, m): 895.1
Total depth (drill pipe measurement from rig floor, mbrf): 1239.5
Total penetration (meters below seafloor, mbsf): 333.5
Total number of cores: 39
Total number of drilled intervals: 3
Total length of cored section (m): 332
Total core recovered (m): 315.50
Core recovery (%): 95.0
Hole 1244D
Latitude: 44°35.1865´N
Longitude: 125°7.1900´W
Time on hole (hr): 37.50 (0530 hr, 16 Jul-1900 hr, 17 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 906.0
Distance between rig floor and sea level (m): 10.9
Water depth (drill pipe measurement from sea level, m): 895.1
Total depth (drill pipe measurement from rig floor, mbrf): 1286
Total penetration (meters below seafloor, mbsf): 380
Total number of cores: 0
Total number of drilled intervals: 1
Total length of cored section (m): 0
Total core recovered (m): 0
Core recovery (%): 0
Hole 1244E
Latitude: 44°35.1709´N
Longitude: 125°7.1719´W
Time on hole (hr): 74.75 (2300 hr, 18 Aug-0145 hr, 22 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 904.8
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 893.6
Total depth (drill pipe measurement from rig floor, mbrf): 1154.8
Total penetration (meters below seafloor, mbsf): 250
Total number of cores: 19
Total number of drilled intervals: 6
Total length of cored section (m): 135.8
Total core recovered (m): 137.73
Core recovery (%): 101.4
Hole 1244F
Latitude: 44°35.1691´N
Longitude: 125°7.1705´W
Time on hole (hr): 5.00 (0145 hr, 22 Aug-0645 hr, 22 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 907.4
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 896.3
Total depth (drill pipe measurement from rig floor, mbrf): 931.5
Total penetration (meters below seafloor, mbsf): 0
Total number of cores: 4
Total number of drilled intervals: 0
Total length of cored section (m): 24.1
Total core recovered (m): 24.9
Core recovery (%): 103.3
Core
Date
(2002)
Local
time
(hr)
Depth (mbsf)
Length (m)
Recovery
(%)
Top
Bottom
Cored
Recovered
204-1244A-





1H 13 Jul 0100 0.0 9.5 9.5 9.99 105.2



Cored totals: 9.5 9.99 105.2



Drilled total: 0.0





Total: 9.5









204-1244B-





1H 13 Jul 0135 0.0 6.6 6.6 6.66 100.9
2H 13 Jul 0220 6.6 16.1 9.5 9.93 104.5
3H 13 Jul 0300 16.1 25.6 9.5 10.11 106.4
4H 13 Jul 0425 25.6 35.1 9.5 10.56 111.2
5H 13 Jul 0500 35.1 44.6 9.5 9.96 104.8
6H 13 Jul 0555 44.6 54.1 9.5 9.63 101.4



Cored totals: 54.1 56.85 105.1



Drilled total: 0.0





Total: 54.1









204-1244C-





1H 13 Jul 1945 0.0 5.5 5.5 5.50 100.0
2H 13 Jul 2020 5.5 15.0 9.5 10.01 105.4
3H 13 Jul 2055 15.0 24.5 9.5 10.19 107.3
4H 13 Jul 2135 24.5 34.0 9.5 10.15 106.8
5H 13 Jul 2200 34.0 43.5 9.5 9.29 97.8
6H 13 Jul 2250 43.5 53.0 9.5 10.01 105.4
7H 14 Jul 0450 53.0 62.5 9.5 9.64 101.5
8H 14 Jul 0720 62.5 72.0 9.5 9.65 101.6
9H 14 Jul 0815 72.0 81.5 9.5 10.21 107.5
10H 14 Jul 0910 81.5 91.0 9.5 9.68 101.9
11H 14 Jul 1000 91.0 100.5 9.5 9.69 102.0
12H 14 Jul 1145 100.5 110.0 9.5 9.98 105.1
13H 14 Jul 1245 110.0 119.5 9.5 10.38 109.3
14P 14 Jul 1410 119.5 120.5 1.0 1.18 118.0



*****Drilled from 120.5 to 121 mbsf*****
15H 14 Jul 1505 121.0 130.5 9.5 8.68 91.4
16P 14 Jul 1610 130.5 131.5 1.0 1.00 100.0



*****Drilled from 131.5 to 132 mbsf*****
17H 14 Jul 1650 132.0 141.5 9.5 5.70 60.0
18P 14 Jul 1830 141.5 142.5 1.0 1.08 108.0



*****Drilled from 142.5 to 143 mbsf*****
19X 14 Jul 1925 143.0 149.2 6.2 7.82 126.1
20X 14 Jul 2215 149.2 158.8 9.6 7.25 75.5
21X 14 Jul 2325 158.8 168.3 9.5 7.21 75.9
22X 15 Jul 0055 168.3 177.9 9.6 8.31 86.6
23X 15 Jul 0155 177.9 187.1 9.2 9.41 102.3
24X 15 Jul 0250 187.1 196.4 9.3 8.90 95.7
25X 15 Jul 0400 196.4 206.1 9.7 9.69 99.9
26X 15 Jul 0515 206.1 215.8 9.7 8.26 85.2
27X 15 Jul 0625 215.8 225.4 9.6 9.05 94.3
28X 15 Jul 0730 225.4 235.1 9.7 9.90 102.1
29X 15 Jul 0850 235.1 244.7 9.6 9.49 98.9
30X 15 Jul 0945 244.7 254.3 9.6 8.85 92.2
31X 15 Jul 1055 254.3 264.0 9.7 8.17 84.2
32X 15 Jul 1200 264.0 273.6 9.6 8.63 89.9
33X 15 Jul 1300 273.6 283.3 9.7 9.62 99.2
34X 15 Jul 1400 283.3 293.0 9.7 8.80 90.7
35X 15 Jul 1525 293.0 302.6 9.6 9.75 101.6
36X 15 Jul 1620 302.6 312.2 9.6 9.59 99.9
37X 15 Jul 1750 312.2 321.9 9.7 2.74 28.2
38X 15 Jul 1920 321.9 331.5 9.6 9.85 102.6
39X 15 Jul 2030 331.5 333.5 2.0 2.19 109.5



Cored totals: 332.0 315.50 95.0



Drilled total: 1.5





Total: 333.5









204-1244D-








*****Drilled from 0 to 380 mbsf*****








204-1244E-





1H 19 Aug 0640 0.0 8.7 8.7 8.76 100.7
2H 19 Aug 0745 8.7 18.2 9.5 9.94 104.6
3P 19 Aug 0840 18.2 19.2 1.0 0.00 0.0



*****Drilled from 19.2 to 20.2 mbsf*****
4H 19 Aug 0910 20.2 29.7 9.5 10.24 107.8
5H 19 Aug 1000 29.7 39.2 9.5 10.11 106.4
6P 19 Aug 1105 39.2 40.2 1.0 1.00 100.0



*****Drilled from 40.2 to 41.2 mbsf*****
7H 19 Aug 1155 41.2 50.7 9.5 10.59 111.5
8Y 19 Aug 1310 50.7 51.7 1.0 0.92 92.0



*****Drilled from 51.7 to 52.6 mbsf*****
9H 19 Aug 1530 52.6 62.1 9.5 9.91 104.3
10H 19 Aug 1625 62.1 71.6 9.5 9.78 102.9
11P 19 Aug 1725 71.6 72.6 1.0 1.00 100.0



*****Drilled from 72.6 to 73.6 mbsf*****
12H 19 Aug 1750 73.6 83.1 9.5 10.11 106.4
13H 19 Aug 1855 83.1 92.6 9.5 8.69 91.5
14H 19 Aug 1925 92.6 102.1 9.5 9.40 98.9
15P 19 Aug 2040 102.1 103.1 1.0 1.00 100.0



*****Drilled from 103.1 to 104.1 mbsf*****
16H 19 Aug 2100 104.1 113.6 9.5 8.94 94.1
17H 19 Aug 2200 113.6 123.1 9.5 9.66 101.7
18H 19 Aug 2300 123.1 132.2 9.1 9.09 99.9
19H 19 Aug 2340 132.2 140.7 8.5 8.59 101.1



*****Drilled from 140.7 to 250 mbsf*****



Cored totals: 135.8 137.73 101.4



Drilled total: 114.2





Total: 250









204-1244F-





1H 22 Aug 0300 0.0 4.1 4.1 4.10 100.0
2H 22 Aug 0335 4.1 13.6 9.5 9.72 102.3
3H 22 Aug 0415 13.6 23.1 9.5 10.08 106.1
4P 22 Aug 0515 23.1 24.1 1.0 1.00 100.0



Cored totals: 24.1 24.90 103.3



Drilled total: 0.0





Total: 24.1