Date
(Aug 2002) |
Local time
(hr) |
Tool depth
(mbsf) |
Remarks
|
---|---|---|---|
20 | 0045 |
|
Last core on deck |
20 | 1015-1200 |
|
Wiper trip up to 80 mbsf; back down to 250 mbsf |
20 | 1200-1215 |
|
Hole displaced with sepiolite mud |
20 | 1215-1400 |
|
Set back top drive; bottom of pipe put at 87.5 mbsf |
20 | 1430 |
|
Start logging rig-up |
20 | 1615 |
|
Start going down with triple combination (TAP/DIT/HLDT/APS/HNGS/QSST) tool string |
20 | 1655 | 0.0 | Stop 5 min at mudline for temperature calibration |
20 | 1712 | 250.0 | Tool at TD; start logging-up pass 1 at 900 ft/hr |
20 | 1807 | 72.5 | Tool back into pipe; speed up to 1500 ft/hr to log mudline |
20 | 1815 | 0.0 | End of pass 1 |
20 | 1830 | 250.0 | Tool at TD; start logging-up pass 2 at 900 ft/hr |
20 | 1900 | 72.5 | End of pass 2; back down for checkshot survey |
20 | 1905 | 250.0 | Tool at TD for QSST checkshot survey |
20 | 1910 | 250.0 | End of QSST; start moving up at 1800 ft/hr |
20 | 2010 |
|
Tool back on rig floor |
20 | 2115 |
|
Finish rig-down |
20 | 2115 |
|
Start logging rig-up |
20 | 2215 |
|
Start going down with the FMS-sonic (FMS/DSI/SGT) tool string |
20 | 2255 | 250.0 | Tool at TD; start logging-up pass at 900 ft/hr |
20 | 2330 | 72.5 | Tool back into pipe; end of pass 1 |
20 | 2355 | 250.0 | Tool at TD; start logging-up pass 2 at 900 ft/hr |
21 | 0030 | 72.5 | End of pass 2; speed up tool to 6000 ft/hr |
21 | 0100 |
|
Tool back on rig floor |
21 | 0145 |
|
Finish rig-down |
Notes: TD = total depth. See Table T8 in the "Explanatory Notes" chapter for definitions of acronyms.