Date
(Aug 2002) |
Local time
(hr) |
Tool depth (mbsf)
|
Remarks
|
---|---|---|---|
13 | 2300 |
|
Last core on deck |
14 | 1500-1615 |
|
Wiper trip up to 345 mbsf; back down to 380 mbsf |
14 | 1645-1715 |
|
Hole displaced with sepiolite mud |
14 | 1715-1900 |
|
Set back top drive; bottom of pipe put at 88 mbsf |
14 | 1900 |
|
Start logging rig-up |
14 | 2030 |
|
Start going down with the triple combination (TAP/DIT/HLDT/APS/HNGS/QSST) tool string |
14 | 2115 | 0 | Stop 5 min at mudline for temperature calibration |
14 | 2153 | 320 | Tool at TD; start logging up at 900 ft/hr |
14 | 2245 | 73 | Tool back into pipe; speed up to 1500 ft/hr to log mudline |
14 | 2255 | 0 | End of pass 1 |
14 | 2315 | 319 | Tool at TD for QSST checkshot survey |
15 | 0035 | 319 | Tool at TD; start logging-up pass 2 at 900 ft/hr |
15 | 0110 | 104 | End of pass 2; speed up tool to 6000 ft/hr |
15 | 0112 | 73 | Tool back in pipe |
15 | 0140 |
|
Tool back on rig floor |
15 | 0300 |
|
Finish rig-down |
15 | 0305 |
|
Start logging rig-up |
15 | 0410 |
|
Start going down with the FMS-sonic (FMS/DSI/SGT) tool string |
15 | 0445 | 319 | Tool at TD; start logging up at 900 ft/hr |
15 | 0530 | 73 | Tool back into pipe; end of pass 1 |
15 | 0550 | 316 | Tool at TD; start logging-up pass 2 at 900 ft/hr |
15 | 0640 | 73 | End of pass 2; speed up tool to 6000 ft/hr |
15 | 0715 |
|
Tool back on rig floor |
15 | 0830 |
|
Finish rig-down |
Notes: TD = total depth. See Table T8 in the "Explanatory Notes" chapter for definitions of acronyms.