Hole 1246A |
Latitude: 44°35.1642´N |
Longitude: 125°8.14´W |
Time on site (hr): 37 (2345 hr, 18 Jul-1800 hr, 19 Jul 2002) |
Time on hole (hr): 18.25 (2345 hr, 18 Jul-1800 hr, 19 Jul 2002) |
Seafloor (drill pipe measurement from rig floor, mbrf): 861.5 |
Distance between rig floor and sea level (m): 10.9 |
Water depth (drill pipe measurement from sea level, m): 850.6 |
Total depth (drill pipe measurement from rig floor, mbrf): 1041.5 |
Total penetration (meters below seafloor, mbsf): 180 |
Total number of cores: 0 |
Total number of drilled intervals: 1 |
Total length of cored section (m): 0 |
Total core recovered (m): 0 |
Core recovery (%): 0 |
Hole 1246B |
Latitude: 44°35.1644´N |
Longitude: 125°8.1235´W |
Time on hole (hr): 18.75 (0400 hr, 11 Aug-2245 hr, 11 Aug 2002) |
Seafloor (drill pipe measurement from rig floor, mbrf): 860.8 |
Distance between rig floor and sea level (m): 11.4 |
Water depth (drill pipe measurement from sea level, m): 849.4 |
Total depth (drill pipe measurement from rig floor, mbrf): 997.5 |
Total penetration (meters below seafloor, mbsf): 136.7 |
Total number of cores: 16 |
Total number of drilled intervals: 0 |
Total length of cored section (m): 136.7 |
Total core recovered (m): 135.34 |
Core recovery (%): 99 |
Core
|
Date
(Aug 2002) |
Local
time (hr) |
Depth (mbsf)
|
Length (m)
|
Recovery
(%) |
||
---|---|---|---|---|---|---|---|
Top
|
Bottom
|
Cored
|
Recovered
|
||||
204-1246A- |
|
|
|
|
|
|
|
|
|
|
*****Drilled from 0 to 180 mbsf***** |
|
|||
204-1246B- |
|
|
|
|
|
|
|
1H | 11 | 0705 | 0.0 | 4.7 | 4.7 | 4.74 | 100.9 |
2H | 11 | 0800 | 4.7 | 14.2 | 9.5 | 9.78 | 102.9 |
3H | 11 | 0900 | 14.2 | 23.7 | 9.5 | 9.80 | 103.2 |
4H | 11 | 0930 | 23.7 | 33.2 | 9.5 | 10.18 | 107.2 |
5H | 11 | 1035 | 33.2 | 42.7 | 9.5 | 10.07 | 106.0 |
6H | 11 | 1100 | 42.7 | 52.2 | 9.5 | 9.87 | 103.9 |
7H | 11 | 1150 | 52.2 | 61.7 | 9.5 | 9.45 | 99.5 |
8H | 11 | 1230 | 61.7 | 71.2 | 9.5 | 9.00 | 94.7 |
9H | 11 | 1335 | 71.2 | 80.7 | 9.5 | 9.07 | 95.5 |
10H | 11 | 1410 | 80.7 | 90.2 | 9.5 | 8.76 | 92.2 |
11H | 11 | 1450 | 90.2 | 99.7 | 9.5 | 7.63 | 80.3 |
12H | 11 | 1625 | 99.7 | 109.2 | 9.5 | 10.03 | 105.6 |
13H | 11 | 1655 | 109.2 | 118.7 | 9.5 | 8.65 | 91.1 |
14H | 11 | 1730 | 118.7 | 122.4 | 3.7 | 3.92 | 105.9 |
15H | 11 | 1830 | 122.4 | 129.8 | 7.4 | 7.43 | 100.4 |
16H | 11 | 2040 | 129.8 | 136.7 | 6.9 | 6.96 | 100.9 |
|
|
|
Cored totals: | 136.7 | 135.34 | 99.0 | |
|
|
|
Drilled total: | 0.0 |
|
|
|
|
|
|
|
Total: | 136.7 |
|
|