Table T1. Coring summary, Site 1249.
Hole 1249A
Latitude: 44°34.2246´N
Longitude: 125°8.8423´W
Time on site (hr): 140.25 (0645 hr, 21 Jul-1650 hr, 21 Jul 2002)
Time on hole (hr): 9.75 (0645 hr, 21 Jul-1650 hr, 21 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 788.5
Distance between rig floor and sea level (m): 11
Water depth (drill pipe measurement from sea level, m): 777.5
Total depth (drill pipe measurement from rig floor, mbrf): 878.5
Total penetration (meters below seafloor, mbsf): 90
Total number of cores: 0
Total number of drilled intervals: 1
Total length of cored section (m): 0
Total core recovered (m): 0
Core recovery (%): 0
Hole 1249B
Latitude: 44°34.2106´N
Longitude: 125°8.8412´W
Time on hole (hr): 28.00 (0930 hr, 24 Jul-1330 hr, 25 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 788.5
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 777.4
Total depth (drill pipe measurement from rig floor, mbrf): 863.4
Total penetration (meters below seafloor, mbsf): 74.9
Total number of cores: 8
Total number of drilled intervals: 0
Total length of cored section (m): 45
Total core recovered (m): 14.01
Core recovery (%): 31.1
Hole 1249C
Latitude: 44°34.2368´N
Longitude: 125°8.8410´W
Time on hole (hr): 22.25 (1330 hr, 25 Jul-1145 hr, 26 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 788.5
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 777.4
Total depth (drill pipe measurement from rig floor, mbrf): 878.5
Total penetration (meters below seafloor, mbsf): 90
Total number of cores: 14
Total number of drilled intervals: 3
Total length of cored section (m): 88.5
Total core recovered (m): 58.84
Core recovery (%): 66.5
Hole 1249D
Latitude: 44°34.2222´N
Longitude: 125°8.8366´W
Time on hole (hr): 5.25 (2230 hr, 4 Aug-0345 hr, 5 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 788.5
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 777.2
Total depth (drill pipe measurement from rig floor, mbrf): 807
Total penetration (meters below seafloor, mbsf): 18.5
Total number of cores: 3
Total number of drilled intervals: 1
Total length of cored section (m): 16.5
Total core recovered (m): 4.78
Core recovery (%): 29
Hole 1249E
Latitude: 44°34.2270´N
Longitude: 125°8.369´W
Time on hole (hr): 4.75 (0345 hr, 5 Aug-0830 hr, 5 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 788.5
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 777.2
Total depth (drill pipe measurement from rig floor, mbrf): 799.5
Total penetration (meters below seafloor, mbsf): 11
Total number of cores: 3
Total number of drilled intervals: 1
Total length of cored section (m): 9
Total core recovered (m): 4.38
Core recovery (%): 48.7
Hole 1249F
Latitude: 44°34.2317´N
Longitude: 125°8.8377´W
Time on hole (hr): 22.75 (0830 hr, 5 Aug-0715 hr, 6 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 788.5
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 777.2
Total depth (drill pipe measurement from rig floor, mbrf): 878.5
Total penetration (meters below seafloor, mbsf): 90
Total number of cores: 16
Total number of drilled intervals: 5
Total length of cored section (m): 82.5
Total core recovered (m): 57.37
Core recovery (%): 69.5
Hole 1249G
Latitude: 44°34.2073´N
Longitude: 125°8.8416´W
Time on hole (hr): 9.00 (2130 hr, 27 Aug-0630 hr, 28 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 788.5
Distance between rig floor and sea level (m): 11.6
Water depth (drill pipe measurement from sea level, m): 776.9
Total depth (drill pipe measurement from rig floor, mbrf): 831.5
Total penetration (meters below seafloor, mbsf): 43
Total number of cores: 5
Total number of drilled intervals: 0
Total length of cored section (m): 43
Total core recovered (m): 11.24
Core recovery (%): 26.1
Hole 1249H
Latitude: 44°34.2108´N
Longitude: 125°8.8365´W
Time on hole (hr): 8.50 (0630 hr, 28 Aug-1500 hr, 28 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 788.5
Distance between rig floor and sea level (m): 11.7
Water depth (drill pipe measurement from sea level, m): 776.8
Total depth (drill pipe measurement from rig floor, mbrf): 841
Total penetration (meters below seafloor, mbsf): 52.5
Total number of cores: 6
Total number of drilled intervals: 0
Total length of cored section (m): 52.5
Total core recovered (m): 27.52
Core recovery (%): 52.4
Hole 1249I
Latitude: 44°34.2111´N
Longitude: 125°8.8437´W
Time on hole (hr): 6.00 (1500 hr, 28 Aug-2100 hr, 28 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 788.5
Distance between rig floor and sea level (m): 11.7
Water depth (drill pipe measurement from sea level, m): 776.8
Total depth (drill pipe measurement from rig floor, mbrf): 822.1
Total penetration (meters below seafloor, mbsf): 33.6
Total number of cores: 4
Total number of drilled intervals: 0
Total length of cored section (m): 33.6
Total core recovered (m): 8.69
Core recovery (%): 25.9
Hole 1249J
Latitude: 44°34.2114´N
Longitude: 125°8.8422´W
Time on hole (hr): 5.50 (2100 hr, 28 Aug-0230 hr, 29 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 788.5
Distance between rig floor and sea level (m): 11.7
Water depth (drill pipe measurement from sea level, m): 776.8
Total depth (drill pipe measurement from rig floor, mbrf): 821
Total penetration (meters below seafloor, mbsf): 32.5
Total number of cores: 3
Total number of drilled intervals: 0
Total length of cored section (m): 32.5
Total core recovered (m): 7.69
Core recovery (%): 23.7
Hole 1249K
Latitude: 44°34.2137´N
Longitude: 125°8.8392´W
Time on hole (hr): 8.25 (0230 hr, 29 Aug-1045 hr, 29 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 788.5
Distance between rig floor and sea level (m): 11.7
Water depth (drill pipe measurement from sea level, m): 776.8
Total depth (drill pipe measurement from rig floor, mbrf): 832.7
Total penetration (meters below seafloor, mbsf): 44.2
Total number of cores: 5
Total number of drilled intervals: 1
Total length of cored section (m): 43.2
Total core recovered (m): 16.87
Core recovery (%): 39.1
Hole 1249L
Latitude: 44°34.2119´N
Longitude: 125°8.8439´W
Time on hole (hr): 10.25 (1045 hr, 29 Aug-2100 hr, 29 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 788.5
Distance between rig floor and sea level (m): 11.7
Water depth (drill pipe measurement from sea level, m): 776.8
Total depth (drill pipe measurement from rig floor, mbrf): 827
Total penetration (meters below seafloor, mbsf): 38.5
Total number of cores: 5
Total number of drilled intervals: 0
Total length of cored section (m): 38.5
Total core recovered (m): 14.15
Core recovery (%): 36.8
Core
Date
(2002)
Local
time
(hr)
Depth (mbsf)
Length (m)
Recovery
(%)
Top
Bottom
Cored
Recovered
204-1249A-








*****Drilled from 0 to 90 mbsf*****
204-1249B-





1W 24 Jul 2305 0.0 29.9 29.9 0.00 0.0
2A 25 Jul 0140 29.9 34.4 4.5 3.05 67.8
3A 25 Jul 0315 34.4 38.9 4.5 1.92 42.7
4A 25 Jul 0355 38.9 43.4 4.5 1.15 25.6
5A 25 Jul 0440 43.4 47.9 4.5 0.93 20.7
6A 25 Jul 0525 47.9 52.4 4.5 2.06 45.8
7A 25 Jul 0615 52.4 56.9 4.5 0.57 12.7
8A 25 Jul 0730 56.9 65.9 9.0 3.81 42.3
9A 25 Jul 0845 65.9 74.9 9.0 0.52 5.8



Cored totals: 74.9 14.01 18.7



Drilled total: 0.0





Total: 74.9

204-1249C-





1H 25 Jul 1750 0.0 2.0 2.0 1.60 80.0
2H 25 Jul 1825 2.0 5.0 3.0 2.85 95.0
3H 25 Jul 2045 5.0 14.5 9.5 2.20 23.2
4H 25 Jul 2200 14.5 24.0 9.5 4.37 46.0
5H 25 Jul 2315 24.0 33.5 9.5 5.79 60.9
6P 26 Jul 0130 33.5 34.5 1.0 1.00 100.0



*****Drilled from 34.5 to 35 mbsf*****
7H 26 Jul 0150 35.0 44.5 9.5 5.69 59.9
8H 26 Jul 0240 44.5 54.0 9.5 6.21 65.4
9H 26 Jul 0340 54.0 63.5 9.5 6.02 63.4
10P 26 Jul 0445 63.5 64.5 1.0 1.00 100.0



*****Drilled from 64.5 to 65 mbsf*****
11H 26 Jul 0510 65.0 74.5 9.5 8.74 92.0
12H 26 Jul 0610 74.5 84.0 9.5 6.34 66.7
13H 26 Jul 0710 84.0 88.5 4.5 6.16 136.9
14P 26 Jul 0815 88.5 89.5 1.0 1.00 100.0



*****Drilled from 89.5 to 90 mbsf*****



Cored totals: 88.5 58.97 66.6



Drilled total: 1.5





Total: 90.0

204-1249D-





1H 5 Aug 0045 0.0 6.0 6.0 2.16 36.0



*****Drilled from 6 to 8 mbsf*****
2Y 5 Aug 0305 8.0 9.0 1.0 0.80 80.0
3H 5 Aug 0350 9.0 18.5 9.5 1.82 19.2



Cored totals: 16.5 4.78 29.0



Drilled total: 2.0





Total: 18.5

204-1249E-





1H 5 Aug 0500 0.0 6.0 6.0 1.19 19.8



*****Drilled from 6 to 8 mbsf*****
2H 5 Aug 0730 8.0 9.0 1.0 0.00 0.0
3H 5 Aug 0820 9.0 11.0 2.0 2.19 109.5



Cored totals: 9.0 3.38 37.6



Drilled total: 2.0





Total: 11.0

204-1249F-





1H 5 Aug 0915 0.0 6.0 6.0 1.94 32.3



*****Drilled from 6 to 8 mbsf*****
2E 5 Aug 1130 8.0 9.0 1.0 0.80 80.0
3H 5 Aug 1235 9.0 11.0 2.0 2.05 102.5



*****Drilled from 11 to 13.5 mbsf*****
4P 5 Aug 1410 13.5 14.5 1.0 1.00 100.0



*****Drilled from 14.5 to 15.5 mbsf*****
5H 5 Aug 1455 15.5 16.5 1.0 0.80 80.0
6X 5 Aug 1655 16.5 20.9 4.4 1.28 29.1
7H 5 Aug 1735 20.9 30.4 9.5 3.50 36.8
8H 5 Aug 1915 30.4 39.9 9.5 4.01 42.2
9H 5 Aug 2000 39.9 49.4 9.5 6.59 69.4
10H 5 Aug 2235 49.4 58.9 9.5 8.93 94.0
11P 5 Aug 2350 58.9 59.9 1.0 1.00 100.0



*****Drilled from 59.9 to 60.9 mbsf*****
12H 6 Aug 0045 60.9 70.4 9.5 8.09 85.2
13Y 6 Aug 0230 70.4 71.4 1.0 0.91 91.0
14P 6 Aug 0340 71.4 72.4 1.0 1.00 100.0



*****Drilled from 72.4 to 73.4 mbsf*****
15H 6 Aug 0420 73.4 82.9 9.5 8.50 89.5
16H 6 Aug 0530 82.9 90.0 7.1 6.97 98.2



Cored totals: 82.5 57.37 69.5



Drilled total: 7.5





Total: 90.0

204-1249G-





1X 28 Aug 0045 0.0 13.5 13.5 3.36 24.9
2E 28 Aug 0230 13.5 14.5 1.0 0.75 75.0
3H 28 Aug 0345 14.5 24.0 9.5 4.44 46.7
4H 28 Aug 0440 24.0 33.5 9.5 2.69 28.3
5H 28 Aug 0535 33.5 43.0 9.5 0.00 0.0



Cored totals: 43.0 11.24 26.1



Drilled total: 0.0





Total: 43.0

204-1249H-





1X 28 Aug 0830 0.0 13.5 13.5 1.70 12.6
2Y 28 Aug 1000 13.5 14.5 1.0 0.75 75.0
3H 28 Aug 1035 14.5 24.0 9.5 4.60 48.4
4H 28 Aug 1145 24.0 33.5 9.5 4.97 52.3
5H 28 Aug 1240 33.5 43.0 9.5 5.70 60.0
6H 28 Aug 1355 43.0 52.5 9.5 9.80 103.2



Cored totals: 52.5 27.52 52.4



Drilled total: 0.0





Total: 52.5

204-1249I-





1X 28 Aug 1725 0.0 13.5 13.5 0.40 3.0
2H 28 Aug 1805 13.5 14.6 1.1 1.31 119.1
3H 28 Aug 1920 14.6 24.1 9.5 1.10 11.6
4H 28 Aug 2025 24.1 33.6 9.5 5.88 61.9



Cored totals: 33.6 8.69 25.9



Drilled total: 0.0





Total: 33.6

204-1249J-





1X 29 Aug 0010 0.0 13.5 13.5 0.00 0.0
2H 29 Aug 0100 13.5 23.0 9.5 2.99 31.5
3H 29 Aug 0150 23.0 32.5 9.5 4.70 49.5



Cored totals: 32.5 7.69 23.7



Drilled total: 0.0





Total: 32.5

204-1249K-





1X 29 Aug 0535 0.0 13.5 13.5 0.82 6.1
2H 29 Aug 0625 13.5 14.7 1.2 1.20 100.0



*****Drilled from 14.7 to 15.7 mbsf*****
3H 29 Aug 0810 15.7 25.2 9.5 5.65 59.5
4H 29 Aug 0910 25.2 34.7 9.5 3.95 41.6
5H 29 Aug 1000 34.7 44.2 9.5 5.25 55.3



Cored totals: 43.2 16.87 39.1



Drilled total:Total: 1.0




44.2

204-1249L-





1X 29 Aug 1315 0.0 11.9 11.9 2.00 16.8
2X 29 Aug 1430 11.9 18.5 6.6 4.65 70.5
3H 29 Aug 1530 18.5 28.0 9.5 3.75 39.5
4H 29 Aug 1715 28.0 37.5 9.5 3.40 35.8
5E 29 Aug 1925 37.5 38.5 1.0 0.35 35.0



Cored totals: 38.5 14.15 36.8



Drilled total: 0.0





Total: 38.5