Table T1. Coring summary, Site 1250.
Hole 1250A
Latitude: 44°34.1176´N
Longitude: 125°9.0179´W
Time on site (hr): 172 (1630 hr, 21 Jul-1245 hr, 22 Jul 2002)
Time on hole (hr): 20.25 (1630 hr, 21 Jul-1245 hr, 22 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 807
Distance between rig floor and sea level (m): 11
Water depth (drill pipe measurement from sea level, m): 796
Total depth (drill pipe measurement from rig floor, mbrf): 1017
Total penetration (meters below seafloor, mbsf): 210
Total number of cores: 0
Total number of drilled intervals: 1
Total length of cored section (m): 0
Total core recovered (m): 0
Core recovery (%): 0
Hole 1250B
Latitude: 44°34.1174´N
Longitude: 125°8.9921´W
Time on hole (hr): 19.5 (1400 hr, 23 Jul-0930 hr, 24 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 807
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 795.9
Total depth (drill pipe measurement from rig floor, mbrf): 987
Total penetration (meters below seafloor, mbsf): 180
Total number of cores: 0
Total number of drilled intervals: 1
Total length of cored section (m): 0
Total core recovered (m): 0
Core recovery (%): 0
Hole 1250C
Latitude: 44°34.1273´N
Longitude: 125°9.0178´W
Time on hole (hr): 28.5 (1230 hr, 2 Aug-1700 hr, 3 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 807
Distance between rig floor and sea level (m): 11.4
Water depth (drill pipe measurement from sea level, m): 795.6
Total depth (drill pipe measurement from rig floor, mbrf): 952
Total penetration (meters below seafloor, mbsf): 145
Total number of cores: 19
Total number of drilled intervals: 2
Total length of cored section (m): 143
Total core recovered (m): 117.29
Core recovery (%): 82
Hole 1250D
Latitude: 44°34.1063´N
Longitude: 125°9.0182´W
Time on hole (hr): 26 (1700 hr, 3 Aug-1900 hr, 4 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 807
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 795.8
Total depth (drill pipe measurement from rig floor, mbrf): 952
Total penetration (meters below seafloor, mbsf): 145
Total number of cores: 19
Total number of drilled intervals: 3
Total length of cored section (m): 142
Total core recovered (m): 133.67
Core recovery (%): 94.1
Hole 1250E
Latitude: 44°34.1124´N
Longitude: 125°9.0171´W
Time on hole (hr): 3.5 (1900 hr, 4 Aug-2230 hr, 4 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 807
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 795.7
Total depth (drill pipe measurement from rig floor, mbrf): 823
Total penetration (meters below seafloor, mbsf): 16
Total number of cores: 2
Total number of drilled intervals: 0
Total length of cored section (m): 16
Total core recovered (m): 11.93
Core recovery (%): 74.6
Hole 1250F
Latitude: 44°34.1166´N
Longitude: 125°9.0025´W
Time on hole (hr): 74.25 (1915 hr, 24 Aug-2130 hr, 27 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 807
Distance between rig floor and sea level (m): 11.6
Water depth (drill pipe measurement from sea level, m): 795.4
Total depth (drill pipe measurement from rig floor, mbrf): 987
Total penetration (meters below seafloor, mbsf): 180
Total number of cores: 13
Total number of drilled intervals: 4
Total length of cored section (m): 77
Total core recovered (m): 69.1
Core recovery (%): 89.7
Core
Date
(Aug 2002)
Local
time
(hr)
Depth (mbsf)
Length (m)
Recovery
(%)
Top
Bottom
Cored
Recovered
204-1250A-








*****Drilled from 0 to 210 mbsf*****
204-1250B-








*****Drilled from 0 to 180 mbsf*****
204-1250C-





1H 2 1510 0.0 4.5 4.5 1.39 30.9
2H 2 1615 4.5 14.0 9.5 0.71 7.5
3H 2 1745 14.0 23.5 9.5 10.14 106.7
4H 2 1910 23.5 33.0 9.5 6.97 73.4
5H 2 2005 33.0 42.5 9.5 8.35 87.9
6H 2 2120 42.5 52.0 9.5 8.89 93.6
7H 2 2210 52.0 61.5 9.5 7.54 79.4
8H 2 2325 61.5 71.0 9.5 9.78 102.9
9P 3 0100 71.0 72.0 1.0 1.00 100.0



*****Drilled from 72 to 73 mbsf*****
10H 3 0235 73.0 82.5 9.5 8.94 94.1
11H 3 0600 82.5 92.0 9.5 8.32 87.6
12H 3 0630 92.0 101.5 9.5 8.21 86.4
13H 3 0710 101.5 111.0 9.5 8.44 88.8
14H 3 0750 111.0 120.5 9.5 4.87 51.3
15H 3 0845 120.5 130.0 9.5 6.69 70.4
16P 3 1055 130.0 131.0 1.0 1.00 100.0



*****Drilled from 131 to 132 mbsf*****
17H 3 1140 132.0 137.5 5.5 5.56 101.1
18Y 3 1255 137.5 138.5 1.0 0.89 89.0
19X 3 1530 138.5 145.0 6.5 9.60 147.7



Cored totals: 143.0 117.29 82.0



Drilled total: 2.0





Total: 145.0

204-1250D-





1H 3 1755 0.0 6.5 6.5 2.76 42.5
2H 3 1910 6.5 16.0 9.5 7.57 79.7
3H 3 2020 16.0 25.5 9.5 10.15 106.8
4H 3 2140 25.5 35.0 9.5 9.89 104.1
5P 3 2255 35.0 36.0 1.0 1.00 100.0



*****Drilled from 36 to 37 mbsf*****
6H 3 2345 37.0 46.5 9.5 10.01 105.4
7H 4 0045 46.5 56.0 9.5 9.92 104.4
8H 4 0220 56.0 65.5 9.5 9.80 103.2
9H 4 0310 65.5 75.0 9.5 10.17 107.1
10H 4 0400 75.0 84.5 9.5 9.55 100.5
11H 4 0450 84.5 94.0 9.5 9.85 103.7
12H 4 0610 94.0 103.5 9.5 7.82 82.3
13P 4 0745 103.5 104.5 1.0 1.00 100.0



*****Drilled from 104.5 to 105.5 mbsf*****
14H 4 0825 105.5 115.0 9.5 6.21 65.4
15X 4 1100 115.0 124.6 9.6 8.39 87.4
16X 4 1200 124.6 134.2 9.6 8.65 90.1
17E 4 1345 134.2 135.2 1.0 0.28 28.0
18P 4 1515 135.2 136.2 1.0 1.00 100.0



*****Drilled from 136.2 to 137.2 mbsf*****
19X 4 1600 137.2 145.0 7.8 9.65 123.7



Cored totals: 142.0 133.67 94.1



Drilled total: 3.0





Total: 145.0

204-1250E-





1H 4 1950 0.0 6.5 6.5 3.16 48.6
2H 4 2115 6.5 16.0 9.5 8.77 92.3



Cored totals: 16.0 11.93 74.6



Drilled total: 0.0





Total: 16.0

204-1250F-








*****Drilled from 0 to 100 mbsf*****
1H 25 0210 100.0 109.5 9.5 8.99 94.6
2H 25 0300 109.5 113.5 4.0 3.94 98.5
3X 25 0410 113.5 119.0 5.5 5.81 105.6
4P 25 0445 119.0 120.0 1.0 1.00 100.0



*****Drilled from 120 to 121 mbsf*****
5H 25 0525 121.0 127.3 6.3 4.54 72.1
6X 25 0635 127.3 130.0 2.7 3.79 140.4
7P 25 0730 130.0 131.0 1.0 1.00 100.0



*****Drilled from 131 to 132 mbsf*****
8P 25 0910 132.0 133.0 1 0.00 0.0



*****Drilled from 133 to 134 mbsf*****
9X 25 1020 134.0 143.6 9.6 8.29 86.4
10X 25 1110 143.6 153.2 9.6 5.96 62.1
11X 25 1205 153.2 162.8 9.6 8.12 84.6
12X 25 1400 162.8 172.4 9.6 8.47 88.2
13X 25 1445 172.4 180.0 7.6 9.19 120.9



Cored totals: 77.0 69.10 89.7



Drilled total: 103.0





Total: 180.0