Date
(Aug 2002) |
Local time
(hr) |
Tool depth (mbsf)
|
Remarks
|
---|---|---|---|
25 | 1445 |
|
Last core on deck |
25 | 1600-1800 |
|
Wiper trip up to 80 mbsf; back down to 180 mbsf |
25 | 1800-1815 |
|
Hole displaced with sepiolite mud |
25 | 1815-1900 |
|
Set back top drive; bottom of pipe put at 73 mbsf |
25 | 1940 |
|
Start logging rig-up |
25 | 2120 |
|
Start going down with the triple combination (TAP/DIT/HLDT/APS/HNGS/QSST) tool string |
25 | 2145 | 0 | Stop 5 min at mudline for temperature calibration |
25 | 2200 | 179 | Tool at TD; start logging-up pass at 900 ft/hr |
25 | 2225 | 58 | Tool back into pipe; speed up to 1500 ft/hr to log mudline |
25 | 2230 | 0 | End of pass 1 |
25 | 2255 | 179 | Tool at TD; start logging-up pass 2 at 900 ft/hr |
25 | 2316 | 58 | Tool back to pipe; end of pass 2 |
25 | 2320 | 179 | Tool at TD for QSST checkshot survey |
25 | 2350 | 58 | Tool back into pipe |
26 | 0035 |
|
Tool back on rig floor |
26 | 0150 |
|
Finish rig-down |
26 | 0150 |
|
Start logging rig up |
26 | 0245 |
|
Start going down with the FMS-sonic (FMS/DSI/SGT) tool string |
26 | 0335 | 182 | Tool at TD; start logging-up pass at 900 ft/hr |
26 | 0350 | 58 | High tension when top of tool enters pipe |
26 | 0410 | 58 | Tool worked into pipe |
26 | 0425 | 58 | Tool back into pipe; end of pass 1 |
26 | 0435 | 182 | Tool at TD; start logging-up pass 2 at 900 ft/hr |
26 | 0455 | 58 | Tool back into pipe |
26 | 0515 |
|
Tool back on rig floor |
26 | 0605 |
|
Finish rig-down |
Notes: TD = total depth. See Table T8 in the "Explanatory Notes" chapter for definitions of acronyms.