Table T1. Coring summary, Site 1251.
Hole 1251A
Latitude: 44°°34.2197´
Longitude: 125°4.4521´
Time on site (hr): 224.25 (1245 hr, 22 Jul-1400 hr, 23 Jul 2002)
Time on hole (hr): 25.25 (1245 hr, 22 Jul-1400 hr, 23 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 1228
Distance between rig floor and sea level (m): 11
Water depth (drill pipe measurement from sea level, m): 1217
Total depth (drill pipe measurement from rig floor, mbrf): 1608
Total penetration (meters below seafloor, mbsf): 380
Total number of cores: 0
Total number of drilled intervals: 1
Total length of cored section (m): 0
Total core recovered (m): 0
Core recovery (%): 0
Hole 1251B
Latitude: 44°34.2191´
Longitude: 125°4.4375´
Time on hole (hr): 86.25 (1145 hr, 26 Jul-0200 hr, 30 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 1224.4
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 1213.3
Total depth (drill pipe measurement from rig floor, mbrf): 1669.5
Total penetration (meters below seafloor, mbsf): 445.1
Total number of cores: 53
Total number of drilled intervals: 3
Total length of cored section (m): 442.1
Total core recovered (m): 368.56
Core recovery (%): 83.4
Hole 1251C
Latitude: 44°34.2058´
Longitude: 125°4.4366´
Time on hole (hr): 4.5 (0200 hr, 30 Jul-0630 hr, 30 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 1221.4
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 1210.2
Total depth (drill pipe measurement from rig floor, mbrf): 123
Total penetration (meters below seafloor, mbsf): 17.6
Total number of cores: 2
Total number of drilled intervals: 0
Total length of cored section (m): 17.6
Total core recovered (m): 13.63
Core recovery (%): 77.4
Hole 1251D
Latitude: 44°34.206´
Longitude: 125°4.4365´
Time on hole (hr): 38.25 (0630 hr, 30 Jul-2045 hr, 31 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 1221.4
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 1210.2
Total depth (drill pipe measurement from rig floor, mbrf): 1451.9
Total penetration (meters below seafloor, mbsf): 230.5
Total number of cores: 30
Total number of drilled intervals: 4
Total length of cored section (m): 226.5
Total core recovered (m): 194.4
Core recovery (%): 85.8
Hole 1251E
Latitude: 44°34.2126´
Longitude: 125°4.4358´
Time on hole (hr): 1.75 (2045 hr, 31 Jul-2230 hr, 31 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 1220
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 1208.8
Total depth (drill pipe measurement from rig floor, mbrf): 1229.5
Total penetration (meters below seafloor, mbsf): 9.5
Total number of cores: 1
Total number of drilled intervals: 0
Total length of cored section (m): 9.5
Total core recovered (m): 9.89
Core recovery (%): 104.1
Hole 1251F
Latitude: 44°34.2159´
Longitude: 125°4.4369´
Time on hole (hr): 0.25 (2230 hr, 31 Jul-2245 hr, 31 Jul 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 1220
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 1208.8
Total depth (drill pipe measurement from rig floor, mbrf): 1229.5
Total penetration (meters below seafloor, mbsf): 9.5
Total number of cores: 1
Total number of drilled intervals: 0
Total length of cored section (m): 9.5
Total core recovered (m): 9.92
Core recovery (%): 104.4
Hole 1251G
Latitude: 44°34.2145´
Longitude: 125°4.4364´
Time on hole (hr): 4.25 (2245 hr, 31 Jul-0300 hr, 1 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 1220
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 1208.8
Total depth (drill pipe measurement from rig floor, mbrf): 1241
Total penetration (meters below seafloor, mbsf): 21
Total number of cores: 2
Total number of drilled intervals: 2
Total length of cored section (m): 10.5
Total core recovered (m): 11.11
Core recovery (%): 105.8
Hole 1251H
Latitude: 44°34.2089´
Longitude: 125°4.4514´
Time on hole (hr): 63.75 (0715 hr, 16 Aug-2300 hr, 18 Aug 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 1220
Distance between rig floor and sea level (m): 11.5
Water depth (drill pipe measurement from sea level, m): 1208.5
Total depth (drill pipe measurement from rig floor, mbrf): 1665
Total penetration (meters below seafloor, mbsf): 445
Total number of cores: 0
Total number of drilled intervals: 1
Total length of cored section (m): 0
Total core recovered (m): 0
Core recovery (%): 0
Core
Date
(2002)
Local
time
(hr)
Depth (mbsf)
Length (m)
Recovery
(%)
Top
Bottom
Cored
Recovered
204-1251A-








*****Drilled from 0 to 380 mbsf*****
204-1251B-





1H 26 Jul 1820 0.0 9.1 9.1 9.10 100.0
2H 26 Jul 1905 9.1 18.6 9.5 0.00 0.0
3H 26 Jul 1940 18.6 28.1 9.5 7.31 76.9
4H 26 Jul 2040 28.1 37.6 9.5 9.62 101.3
5H 26 Jul 2125 37.6 47.1 9.5 8.87 93.4
6H 26 Jul 2155 47.1 56.6 9.5 8.70 91.6
7H 26 Jul 2305 56.6 66.1 9.5 9.75 102.6
8H 26 Jul 2335 66.1 75.6 9.5 9.20 96.8
9H 27 Jul 0010 75.6 85.1 9.5 0.00 0.0
10H 27 Jul 0105 85.1 94.6 9.5 7.41 78.0
11H 27 Jul 0800 94.6 104.1 9.5 7.64 80.4
12P 27 Jul 0955 104.1 105.1 1.0 1.00 100.0



*****Drilled from 105.1 to 106.1 mbsf*****
13H 27 Jul 1045 106.1 115.6 9.5 9.64 101.5
14H 27 Jul 1135 115.6 125.1 9.5 8.66 91.2
15H 27 Jul 1215 125.1 134.6 9.5 8.47 89.2
16H 27 Jul 1310 134.6 144.1 9.5 8.77 92.3
17H 27 Jul 1350 144.1 153.6 9.5 8.32 87.6
18P 27 Jul 1510 153.6 154.6 1.0 1.00 100.0



*****Drilled from 154.6 to 155.6 mbsf*****
19H 27 Jul 1800 155.6 163.2 7.6 8.09 106.4
20H 27 Jul 1845 163.2 171.7 8.5 8.63 101.5
21Y 27 Jul 2000 171.7 172.7 1.0 0.90 90.0
22H 27 Jul 2055 172.7 182.2 9.5 7.89 83.1
23H 27 Jul 2140 182.2 189.0 6.8 6.79 99.9
24H 27 Jul 2240 189.0 194.6 5.6 0.00 0.0
25X 27 Jul 2350 194.6 204.2 9.6 0.44 4.6
26X 28 Jul 0110 204.2 213.5 9.3 8.09 87.0
27X 28 Jul 0215 213.5 223.1 9.6 9.37 97.6
28X 28 Jul 0335 223.1 232.8 9.7 7.90 81.4
29X 28 Jul 0445 232.8 242.4 9.6 6.38 66.5
30X 28 Jul 0559 242.4 252.1 9.7 6.14 63.3
31X 28 Jul 0750 252.1 261.7 9.6 6.25 65.1
32X 28 Jul 0915 261.7 271.3 9.6 7.89 82.2
33X 28 Jul 1045 271.3 281.0 9.7 9.29 95.8
34X 28 Jul 1210 281.0 290.6 9.6 8.17 85.1
35P 28 Jul 1310 290.6 291.6 1.0 1.00 100.0



*****Drilled from 291.6 to 292.6 mbsf*****
36X 28 Jul 1610 292.6 300.6 8.0 8.05 100.6
37X 28 Jul 1740 300.6 310.3 9.7 8.41 86.7
38X 28 Jul 1900 310.3 319.9 9.6 8.44 87.9
39X 28 Jul 2040 319.9 329.6 9.7 9.69 99.9
40Y 28 Jul 2210 329.6 330.6 1.0 0.90 90.0
41X 28 Jul 2355 330.6 339.2 8.6 7.69 89.4
42X 29 Jul 0115 339.2 348.8 9.6 9.23 96.1
43X 29 Jul 0250 348.8 358.4 9.6 9.05 94.3
44X 29 Jul 0405 358.4 368.0 9.6 8.96 93.3
45X 29 Jul 0530 368.0 377.6 9.6 9.65 100.5
46X 29 Jul 0740 377.6 387.3 9.7 9.43 97.2
47X 29 Jul 0935 387.3 396.9 9.6 9.40 97.9
48E 29 Jul 1155 396.9 397.9 1.0 0.00 0.0
49X 29 Jul 1345 397.9 406.5 8.6 8.06 93.7
50X 29 Jul 1530 406.5 416.2 9.7 8.77 90.4
51X 29 Jul 1725 416.2 425.8 9.6 10.01 104.3
52X 29 Jul 1940 425.8 435.5 9.7 8.99 92.7
53X 29 Jul 2235 435.5 445.1 9.6 7.15 74.5



Cored totals: 442.1 368.56 83.4



Drilled total: 3.0





Total: 445.1

204-1251C-





1H 30 Jul 0325 0.0 8.1 8.1 8.18 101.0
2X 30 Jul 0555 8.1 17.6 9.5 5.45 57.4



Cored totals: 17.6 13.63 77.4



Drilled total: 0.0





Total: 17.6

204-1251D-





1X 30 Jul 0725 0.0 8.1 8.1 3.23 39.9
2X 30 Jul 0755 8.1 17.6 9.5 3.35 35.3
3X 30 Jul 0835 17.6 26.9 9.3 8.12 87.3
4H 30 Jul 0905 26.9 36.4 9.5 7.77 81.8
5H 30 Jul 0945 36.4 45.9 9.5 9.67 101.8
6P 30 Jul 1055 45.9 46.9 1.0 1.00 100.0



*****Drilled from 46.9 to 47.9 mbsf*****
7H 30 Jul 1135 47.9 57.4 9.5 8.27 87.1
8H 30 Jul 1205 57.4 66.9 9.5 8.90 93.7
9H 30 Jul 1240 66.9 76.4 9.5 8.86 93.3
10P 30 Jul 1405 76.4 77.4 1.0 1.00 100.0



*****Drilled from 77.4 to 78.4 mbsf*****
11H 30 Jul 1450 78.4 87.9 9.5 9.18 96.6
12H 30 Jul 1520 87.9 97.4 9.5 9.13 96.1
13H 30 Jul 1555 97.4 106.9 9.5 9.36 98.5
14H 30 Jul 1640 106.9 116.4 9.5 9.68 101.9
15H 30 Jul 1705 116.4 125.9 9.5 9.21 96.9
16H 30 Jul 1800 125.9 135.4 9.5 10.04 105.7
17H 30 Jul 1840 135.4 144.9 9.5 9.90 104.2
18H 30 Jul 1925 144.9 154.4 9.5 3.26 34.3
19H 30 Jul 2145 154.4 163.9 9.5 9.59 100.9
20H 31 Jul 0125 163.9 173.4 9.5 9.67 101.8
21P 31 Jul 0335 173.4 174.4 1.0 1.00 100.0



*****Drilled from 174.4 to 175.4 mbsf*****
22X 31 Jul 0610 175.4 179.1 3.7 5.69 153.8
23X 31 Jul 0715 179.1 188.6 9.5 6.66 70.1
24X 31 Jul 0825 188.6 198.2 9.6 8.08 84.2
25X 31 Jul 0930 198.2 207.5 9.3 8.37 90.0
26X 31 Jul 1215 207.5 216.8 9.3 7.50 80.6
27X 31 Jul 1310 216.8 226.5 9.7 5.82 60.0
28Y 31 Jul 1500 226.5 227.5 1.0 0.87 87.0
29P 31 Jul 1640 227.5 228.5 1.0 1.00 100.0



*****Drilled from 228.5 to 229.5 mbsf*****
30E 31 Jul 1830 229.5 230.5 1.0 0.22 22.0



Cored totals: 226.5 194.40 85.8



Drilled total: 4.0





Total: 230.5

204-1251E-





1H 31 Jul 2225 0.0 9.5 9.5 9.89 104.1



Cored totals: 9.5 9.89 104.1



Drilled total: 0.0





Total: 9.5

204-1251F-





1H 31 Jul 2250 0.0 9.5 9.5 9.92 104.4



Cored totals: 9.5 9.92 104.4



Drilled total: 0.0





Total: 9.5

204-1251G-








*****Drilled from 0 to 2.5 mbsf*****
1H 31 Jul 2320 2.5 12.0 9.5 10.11 106.4



*****Drilled from 12 to 20 mbsf*****
2P 1 Aug 0100 20 21.0 1.0 1.00 100.0



Cored totals: 10.5 11.11 105.8



Drilled total: 10.5





Total: 21.0

204-1251H-








*****Drilled from 0 to 445 mbsf***** 12.6