Date
(Aug 2002) |
Local time
(hr) |
Tool depth
(mbsf) |
Remarks
|
---|---|---|---|
17 | 0115 |
|
Drilling completed |
17 | 0115-0130 | 445.0 | Hole swept with sepiolite mud |
17 | 0130-1015 |
|
Wiper trip up to 80 mbsf; back down to 440 mbsf |
17 | 1200-1230 | 414.8 | Hole displaced with sepiolite mud |
17 | 1230-1415 |
|
Set back top drive; bottom of pipe put at 94.5 mbsf |
17 | 1415 |
|
Start logging rig-up |
17 | 1630 |
|
Start going down the triple combination (TAP/DIT/HLDT/APS/HNGS/QSST) tool string |
17 | 1730 | 0.0 | Stop 5 min at mudline for temperature calibration |
17 | 1800 | 240.5 | Tool at TD; start logging-up pass at 900 ft/hr |
17 | 1910 | 78.5 | Tool back into pipe; speed up to 1500 ft/hr to log mudline |
17 | 1920 | 0.0 | End of pass 1 |
17 | 1935 | 225.5 | Tool at TD for QSST checkshot survey |
17 | 2015 | 225.5 | Tool at TD; start logging-up pass 2 at 900 ft/hr |
17 | 2045 | 78.5 | Tool back in pipe; end of pass 2 |
17 | 2120 |
|
Tool back on rig floor |
17 | 2245 |
|
Finish rig down |
17 | 2245 |
|
Start logging rig-up |
17 | 2345 |
|
Start going down with the FMS-sonic (FMS/DSI/SGT) tool |
18 | 0055 | 207.5 | Tool at TD; start logging-up pass at 900 ft/hr |
18 | 0125 | 78.5 | Tool back into pipe; end of pass 1 |
18 | 0145 | 209.5 | Tool at TD; start logging-up pass 2 at 900 ft/hr |
18 | 0215 | 78.5 | Tool back into pipe; end of pass 2 |
18 | 0245 |
|
Tool back on rig floor |
18 | 0345 |
|
Finish rig-down |
Note: TD = total depth. See Table T8 in the "Explanatory Notes" chapter for definitions of acronyms.