Date
(Aug 2002) |
Local time
(hr) |
Tool depth (mbsf)
|
Remarks
|
---|---|---|---|
31 | 0140 |
|
Last core on deck |
31 | 0145-0215 |
|
Circulated hole bottoms up with 50 bbl of a sepiolite mud |
31 | 0215-0230 |
|
Hole displaced with sepiolite mud |
31 | 0230-0350 |
|
Set back top drive; bottom of pipe put at 90 mbsf |
31 | 0350 |
|
Start logging rig-up |
31 | 0600 |
|
Start going down with triple combination (TAP/DIT/HLDT/APS/HNGS) tool string |
31 | 0640 | 0 | Stop 5 min at mudline for temperature calibration |
31 | 0700 | 262 | Tool at TD; start logging-up pass at 900 ft/hr |
31 | 0745 | 75 | Tool back into pipe; speed up to 1500 ft/hr to log mudline |
31 | 0755 | 0 | End of pass 1 |
31 | 0805 | 184 | Tool at TD; start logging-up pass 2 at 900 ft/hr |
31 | 0835 | 75 | Tool back in pipe; end of pass 2 |
31 | 0915 |
|
Tool back on rig floor |
31 | 1010 |
|
Finish rig-down |
31 | 1045 |
|
Start logging rig-up |
31 | 1210 |
|
Start going down with FMS-sonic (FMS/DSI/SGT) tool |
31 | 1310 | 262 | Tool at TD; start logging-up pass at 900 ft/hr |
31 | 1345 | 75 | Tool back into pipe; end of pass 1 |
31 | 1400 | 262 | Tool at TD; start logging-up pass 2 at 900 ft/hr |
31 | 1445 | 75 | Tool back in pipe; end of pass 2 |
31 | 1530 |
|
Tool back on rig floor |
31 | 1630 |
|
Finish rig-down |
Notes: TD = total depth. See Table T8 in the "Explanatory Notes" chapter for definitions of acronyms.