Date
(Oct 2002) |
Local time
(UTC - 5 hr) |
Tool depth
(mbsf) |
Remarks
|
---|---|---|---|
2 | 1100 |
|
Last core on deck |
2 |
|
|
Circulated the hole from the bottom up with 30 bbl of sepiolite mud twice |
3 | 2330-0640 | 150 | Triple combo tool would not penetrate a bridge at 4537 mbrf (150 mbsf) |
3 |
|
|
Logging operation was postponed until after 10-in casing into the top of the first sill |
7 | 0145-0215 |
|
Circulated the hole from the bottom up with 50 bbl of sepiolite mud |
7 | 0215-0230 |
|
Hole displaced with sepiolite mud |
7 | 0230-0350 |
|
Set back top drive; bottom of pipe put at 90 mbsf |
7 | 2130 |
|
Start logging rig-up |
8 | 0000 |
|
Start going downhole with triple combo TAP/DIT/HLDS/APS/HNGS tool string |
8 | 0215 |
|
Lost power to tools because of oil leaking in HLDS; changed to HLDT |
8 | 0730 |
|
Start going downhole again with triple combo TAP/DIT/HLDT/APS/HNGS tool string |
8 | 0901 | 0 | Stop for 5 min at mudline for temperature calibration |
8 | 1006 | 530 | Tool at total depth; start logging up at 900 ft/hr |
8 | 1033 | 413 | Tool back into pipe |
8 | 1127 | 0 | End of run; tool at seafloor |
8 | 1310 |
|
Tool back on rig floor |
8 | 1400 |
|
Finish rig-down |
8 | 1400 |
|
Start logging rig-up |
8 | 1500 |
|
Start going downhole with FMS-sonic FMS/DSI/SGT tool string |
8 | 1715 | 530 | Tool at total depth; start logging up at 900 ft/hr |
8 | 1740 | 413 | Tool back into pipe; end of pass 1 |
8 | 1756 | 564 | Tool at total depth; start logging-up pass 2 at 900 ft/hr |
8 | 1830 | 413 | Tool back in pipe; end of pass 2 |
8 | 1930 |
|
Tool back on rig floor |
8 | 2030 |
|
Finish rig-down |
Notes: Triple combo = triple combination. UTC = Universal Time Coordinated. See Table T7 in the "Explanatory Notes" chapter for explanations of acronyms used to describe tool strings and tools.