Table T1. Coring summary, Site 1254.
Hole 1254A
Latitude: 9°39.6989´N
Longitude: 86°10.7435´W
Time on site: 367.2 hr
Time on hole (hr): 191.58 (0945 hr, 11 Oct-0920 hr, 19 Oct 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 4194.0
Distance between rig floor and sea level (m): 11.20
Water depth (drill pipe measurement from sea level, m): 4182.8
Total depth (drill pipe measurement from rig floor, mbrf): 4561.5
Total penetration (meters below seafloor, mbsf): 367.5
Total length of cored section (m): 140.5
Total length of drilled intervals (m): 227.0
Total core recovered (m): 125.0
Core recovery (%): 89
Total number of cores: 16
Total number of drilled intervals: 3
Hole 1254B
Latitude: 9°39.7187´N
Longitude: 86°10.7274´W
Time on hole (hr): 7.31 (0920 hr, 19 Oct-1645 hr, 26 Oct 2002)
Seafloor (drill pipe measurement from rig floor, mbrf): 4187.0
Distance between rig floor and sea level (m): 11.4
Water depth (drill pipe measurement from sea level, m): 4175.6
Total depth (drill pipe measurement from rig floor, mbrf): 4465.0
Total penetration (meters below seafloor, mbsf): 278.0
Total length of drilled intervals (m): 278.0
Core recovery: NA
Remark: This hole was intended to emplace the downhole CORK-II/OsmoSampler. Only drilling/casing was done, and no core was taken in this hole.
Core
Date
(Oct 2002)
Ship local
time* (hr)
Depth (mbsf)
Length (m)
Recovery
(%)
Remarks
Top
Bottom
Cored
Recovered
205-1254A-









*****Drilled from 0.0 to 50.0 mbsf*****
DVTPP at 50 mbsf; AHC



*****Drilled from 50.0 to 150.0 mbsf*****
DVTP at 150 mbsf; AHC
1R 14 0415 150.0 155.5 5.5 5.99 108.9 Whirl-Pak
2R 14 0625 155.5 165.1 9.6 8.30 86.5 Whirl-Pak
3R 14 0825 165.1 174.7 9.6 6.71 69.9 Whirl-Pak
4R 14 1025 174.7 184.4 9.7 8.16 84.1 Whirl-Pak; AHC
5R 14 1250 184.4 194.1 9.7 9.76 100.6 Whirl-Pak; AHC
6R 14 1510 194.1 203.8 9.7 9.86 101.7 Whirl-Pak; AHC; DVTPP at 203.8 mbsf
7R 14 1930 203.8 213.4 9.6 8.41 87.6 Whirl-Pak; AHC
8R 14 2145 213.4 223.0 9.6 9.40 97.9 Whirl-Pak; AHC



*****Drilled from 223.0 to 300.0 mbsf*****

9R 15 1125 300.0 309.7 9.7 7.30 75.3 Whirl-Pak
10R 15 1355 309.7 319.3 9.6 9.98 104.0 Whirl-Pak
11R 15 1625 319.3 328.9 9.6 9.20 95.8 Whirl-Pak
12R 15 1900 328.9 338.5 9.6 4.40 45.8 Whirl-Pak
13R 15 2115 338.5 348.1 9.6 9.68 100.8 Whirl-Pak
14R 15 2310 348.1 357.7 9.6 8.01 83.4 Whirl-Pak
15R 16 0120 357.7 362.7 5.0 4.58 91.6 Whirl-Pak
16R 16 0320 362.7 367.5 4.8 5.26 109.6 Whirl-Pak



Cored totals: 140.5 125.00 89.0



Drilled totals: 227.0






Total: 367.5


Notes: * = Ship local time is Universal TIme Coordinated - 5 hr. DVTPP = Davis-Villinger Temperature-Pressure Probe, DVTP = Davis-Villinger Temperature Probe. Whirl-Pak = microbiology microsphere contamination testing. AHC = active heave compensation. NA = not applicable.