Figures F1-F3
Tables T1-T2

F1. Drilling locations.

F2. Equipment schematic.

F3. Permeability plot.

Tables T1-T2

T1. Permeability test results.

T2. Grain-size test results.

Figures F1-F3
Tables T1-T2