Initial Reports, Volume 206 Ms 206IR-103 Chapter 3, Table T4. Site 1256 operations summary. Notes: AHC = automatic heave compensation. TD = total depth. Core Top (mbsf) Cored (m) Curated (m) Recovered (m) Recovery (%) Date (2002) Local time (hr) Comment 206-1256A- 1H 0 2.3 2.37 2.37 103 15-Nov 700 206-1256B- 1H 0 6.1 6.14 6.14 100.7 15-Nov 835 2H 6.1 9.5 9.86 9.86 103.8 15-Nov 935 Tensor on @ 0930 hr 3H 15.6 9.5 9.88 9.88 104 15-Nov 1030 Tensor on @ 0930 hr 4H 25.1 9.5 10.18 10.18 107.2 15-Nov 1155 5H 34.6 9.5 9.92 9.92 104.4 15-Nov 1235 6H 44.1 9.5 10.01 10.01 105.4 15-Nov 1405 7H 53.6 9.5 9.84 9.84 103.6 15-Nov 1500 8H 63.1 9.5 9.96 9.96 104.8 15-Nov 1555 9H 72.6 9.5 9.82 9.82 103.4 15-Nov 1700 Tensor on @ 1700 hr 10H 82.1 9.5 9.53 9.53 100.3 15-Nov 1755 11H 91.6 9.5 9.93 9.93 104.5 15-Nov 1855 12H 101.1 9.5 9.94 9.94 104.6 15-Nov 1950 13H 110.6 9.5 7.44 7.44 78.3 15-Nov 2055 Imploded top and bottom 14H 120.1 9.5 9.97 9.97 104.9 15-Nov 2150 15H 129.6 9.5 9.73 9.73 102.4 15-Nov 2250 16H 139.1 9.5 9.73 9.73 102.4 15-Nov 2350 17H 148.6 9.5 10 10 105.3 16-Nov 105 Tensor out/in @ 2345 hr 18H 158.1 2 2.03 2.03 101.5 16-Nov 205 19X 160.1 5.1 4.02 4.02 78.8 16-Nov 340 20X 165.2 9.6 8.63 8.63 89.9 16-Nov 445 21X 174.8 9.2 7.71 7.71 83.8 16-Nov 545 22X 184 9.7 9.5 9.5 97.9 16-Nov 640 23X 193.7 9.7 9.09 9.09 93.7 16-Nov 735 24X 203.4 9.6 6.81 6.81 70.9 16-Nov 830 25X 213 9.7 5.8 5.8 59.8 16-Nov 950 26X 222.7 9.3 4.03 4.03 43.3 16-Nov 1050 27X 232 9.6 0.29 0.29 3 16-Nov 1155 28X 241.6 9.1 4.25 4.25 46.7 16-Nov 1335 29X 250.7 1 0.13 0.1 10 16-Nov 1500 206-1256C- 1R 220.1 9.4 0.15 0.15 1.6 17-Nov 2230 2R 229.5 9.5 1.85 1.85 19.5 17-Nov 2340 3R 239 6 4.67 4.67 77.8 18-Nov 35 4R 245 7.4 0.57 0.53 7.2 18-Nov 220 Tag basalt @ 3897.2 m (251.8 mbsf), S/B out 5R 252.4 4.7 3.89 3.27 69.6 18-Nov 805 Note: excessive torque @ 3901.5 m (256.1 mbsf) 6R 257.1 9.3 6.8 6.21 66.8 18-Nov 1630 7R 266.4 9.1 6.2 5.55 61 18-Nov 2340 Whirl-Pak, tracer 8R 275.5 9.2 7.44 7.04 76.5 19-Nov 1145 9R 284.7 9.2 10.07 10.07 109.5 19-Nov 1750 10R 293.9 9.4 7.08 7.03 74.8 20-Nov 220 11R 303.3 9.5 10.24 10.22 107.6 20-Nov 1215 Whirl-Pak/tracer other 12R 312.8 9.2 4.78 4.32 47 20-Nov 2125 AHC on 13R 322 9.1 0.16 0.16 1.8 21-Nov 425 14R 331.1 9.2 0 0 0 21-Nov 1115 TD Hole 1256C: no recovery 206-1256D- 2R 276.1 2 1.41 1.44 72 7-Dec 325 3R 278.1 7 4.61 4.48 64 7-Dec 845 4R 285.1 4.8 5.31 5.29 110.2 7-Dec 1150 5R 289.9 4.8 4.61 4.58 95.4 7-Dec 1530 6R 294.7 9.2 9.27 9.39 102.1 7-Dec 2340 7R 303.9 9.4 8.57 8.34 88.7 8-Dec 315 8R 313.3 9.5 8.4 8.15 85.8 8-Dec 710 9R 322.8 4.6 6.03 5.98 130 8-Dec 1035 10R 327.4 4.5 4.86 4.8 106.7 8-Dec 1345 11R 331.9 9.3 6.34 6.37 68.5 8-Dec 1759 12R 341.2 9.1 10.28 10.38 114.1 9-Dec 130 13R 350.3 9.2 3.83 3.23 35.1 9-Dec 530 14R 359.5 4.7 3.18 2.77 58.9 9-Dec 825 15R 364.2 4.7 3.81 3.09 65.7 9-Dec 1345 16R 368.9 4.6 1.25 1.01 22 9-Dec 1600 AHC on 17R 373.5 4.5 1.26 1.01 22.4 9-Dec 1830 18R 378 4.7 2.68 2.2 46.8 9-Dec 2140 19R 382.7 4.7 0.5 0.5 10.6 9-Dec 2359 20R 387.4 9.4 1.28 1.23 13.1 10-Dec 420 21R 396.8 9.2 2.57 2.1 22.8 10-Dec 840 TD bit 2 @ 49.6 hr 22R 406 4.3 5.48 4.88 113.5 11-Dec 1340 23R 410.3 9.2 2.32 1.98 21.5 11-Dec 1840 24R 419.5 9.3 3.32 2.5 26.9 12-Dec 10 25R 428.8 9.5 0.86 0.61 6.4 12-Dec 600 26R 438.3 7.1 8.56 7.48 105.4 12-Dec 1530 27R 445.4 5.5 3.96 3.75 68.2 12-Dec 2105 Shot @ 2032 hr 28R 450.9 5.7 2.1 1.65 28.9 13-Dec 200 29R 456.6 4.8 1.94 1.5 31.2 13-Dec 455 30R 461.4 4.6 0.77 0.79 17.2 13-Dec 655 31R 466 9.2 1.55 1.3 14.1 13-Dec 1330 32R 475.2 5.8 4.83 4.38 75.5 13-Dec 2155 33R 481 3.4 3.62 3.27 96.2 14-Dec 810 34R 484.4 4.6 5.02 4.45 96.7 14-Dec 1615 35R 489 5 2.91 2.58 51.6 14-Dec 2145 36R 494 6.1 2.44 2.2 36.1 16-Dec 135 37R 500.1 4.2 5.68 5.15 122.6 16-Dec 920 38R 504.3 9.2 3.38 3.44 37.4 16-Dec 1925 39R 513.5 4 2.93 2.85 71.2 16-Dec 2355 Nonmagnetic core barrel 40R 517.5 7.3 1.15 0.96 13.2 17-Dec 645 41R 524.8 4.6 2.97 2.57 55.9 17-Dec 1210 Monel core barrel 42R 529.4 4.5 2.77 2.59 57.6 17-Dec 1815 43R 533.9 9.2 2.21 1.78 19.3 17-Dec 2320 Nonmagnetic core barrel 44R 543.1 9.4 2.77 2.47 26.3 18-Dec 545 45R 552.5 9 1.73 1.36 15.1 18-Dec 1330 Monel core barrel, two attempts to land core barrel 46R 561.5 9.5 3.68 3.35 35.3 18-Dec 2145 47R 571 6 2.95 2.53 42.2 19-Dec 2359 Monel core barrel 48R 577 5.1 2.35 2.22 43.5 20-Dec 425 49R 582.1 9.4 2.43 2.27 24.1 20-Dec 1130 Monel core barrel 50R 591.5 4.6 1.49 1.32 28.7 20-Dec 1435 51R 596.1 4.6 2.91 2.47 53.7 20-Dec 1730 Monel core barrel 52R 600.7 9.1 2.2 2.18 24 21-Dec 110 53R 609.8 8.3 3.7 3.7 44.6 21-Dec 1125 Monel core barrel 54R 618.1 9.3 4.3 4.05 43.5 21-Dec 2320 55R 627.4 9.2 2.4 2.7 29.3 22-Dec 710 Nonmagnetic core barrel 56R 636.6 9.2 4.69 4.32 47 22-Dec 1430 57R 645.8 9.2 5.92 5.45 59.2 22-Dec 2145 Nonmagnetic core barrel 58R 655 4 1.89 1.83 45.8 23-Dec 2245 59R 659 9.6 5.29 4.72 49.2 24-Dec 605 Nonmagnetic core barrel 60R 668.6 9.4 2.04 2.03 21.6 24-Dec 1145 61R 678 9.2 1.5 1.46 15.9 24-Dec 1545 Nonmagnetic core barrel 62R 687.2 9.3 1.33 1.1 11.8 24-Dec 2320 63R 696.5 4.6 1.58 1.6 34.8 25-Dec 400 Monel core barrel 64R 701.1 4.6 2.76 2.88 62.6 25-Dec 905 65R 705.7 4.7 3.86 3.9 83 25-Dec 1430 66R 710.4 4.4 0.93 0.88 20 25-Dec 2025 67R 714.8 4.7 4.22 4.13 87.9 26-Dec 240 Monel core barrel 68R 719.5 4.6 1.63 1.68 36.5 26-Dec 615 69R 724.1 4.6 1.25 1.1 23.9 26-Dec 945 Monel core barrel 70R 728.7 4.6 2.46 2.3 50 26-Dec 1440 71R 733.3 4.6 1.77 1.68 36.5 26-Dec 1900 Nonmagnetic core barrel 72R 737.9 4.5 2.45 2.39 53.1 27-Dec 10 73R 742.4 4.8 1.9 1.83 38.1 27-Dec 505 Monel core barrel 74R 747.2 4.8 2.46 2.4 50 27-Dec 1155