Table T14. Breakdown of logging operations, Hole 1265A.
Date
(Apr 2003)
Local time (hr)
Operations
10 1200 Hole preparation complete, rig up triple combo (MGT-HNGS-APS-HLDS-DIT-TAP)

1700 Run into hole with triple combo

1800 Uplog with triple combo (HNGS-APS-HLDS-DIT) at 900 ft/hr from total depth

1915 Going down for a second pass

1935 Repeat with triple combo (HNGS-HLDS-DIT, no APS)

1955 Going down for an MGT pass

2010 Uplog with MGT at 600 ft/hr from total depth

2230 Pull tools out of hole and rigdown
11 0000 Rig up FMS-sonic (SGT-DSI-GPIT-FMS)

0030 Run into hole with FMS-sonic

0200 Short pass with FMS-sonic at 900 ft/hr from total depth

0215 Going down for a main pass

0220 Uplog with FMS-sonic at 900 ft/hr from total depth

0315 Pull tools out of hole and rig down

0500 Rig up WST-3

0530 Run into hole with WST-3

0700 Checkshots (7)

0820 Pull tool out of hole and rig down

0930 Clear rig floor of logging tools, sheaves, and wireline

1100 End of logging operation

Notes: Drillers total depth = 3392.0 mbrf, water depth = 3060 m, end of pipe = 69.0 mbsf, total depth = 321 mbsf. MGT = Multi-Sensor Gamma Ray Tool, HNGS = Hostile Environment Natural Gamma Ray Sonde, APS = Accelerator Porosity Sonde, HLDS = Hostile Environment Litho-Density Sonde, DIT = Dual Induction Tool, TAP = Temperature/Acceleration/Pressure tool, FMS = Formation MicroScanner, SGT = Scintillation Gamma Ray Tool, DSI = Dipole Sonic Imager tool, GPIT = General Purpose Inclinometry Tool, WST-3 = three-component Well Seismic Tool.