Table T1. Coring summary, Site 1271.
Hole 1271A
Latitude:15°2.2224´N
Longitude: 44°56.8865´W
Time on site: 111.00 (1645 hr, 2 June–0745 hr, 7 June 2003)
Time on hole: 34.00 (1645 hr, 2 June–0245 hr, 4 June 2003)
Seafloor (drill pipe measurement from rig floor, mbrf): 3623.0
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 3611.9
Total depth (drill pipe measurement from rig floor, mbrf): 3667.8
Total penetration (meters below seafloor, mbsf): 44.8
Total length of cored section (m): 44.8
Total core recovered (m): 5.76
Core recovery (%): 12.9
Total number of cores: 6
Hole 1271B
Latitude:15°2.1888´N
Longitude: 44°56.9119´W
Time on hole: 77.0 (0245 hr, 4 June–0745 hr, 7 June 2003)
Seafloor (drill pipe measurement from rig floor, mbrf): 3596.0
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 3584.9
Total depth (drill pipe measurement from rig floor, mbrf): 3699.8
Total penetration (meters below seafloor, mbsf): 103.8
Total length of cored section (m): 103.8
Total core recovered (m): 15.9
Core recovery (%): 15.3
Total number of cores: 20
Core
Date
(Jun 2003)
Local time (hr)
Depth (mbsf)
Length (m)
Recovery (%)
Remarks
Top
Bottom
Cored
Recovered
209-1271A-






1R 3 1015 0.0 13.9 13.9 2.32 16.7
2R 3 1245 13.9 18.9 5.0 0.12 2.4
3R 3 1435 18.9 28.5 9.6 0.54 5.6
4R 3 1725 28.5 38.1 9.6 2.32 24.2
5R 3 2100 38.1 42.8 4.7 0.23 4.9 AHC
6R 4 0210 42.8 44.8 2.0 0.23 11.5 Core catcher jam



Cored totals: 44.8 5.76 12.9
209-1271B-






1R 4 0925 0.0 12.0 12.0 0.47 3.9 AHC
2R 4 1100 12.0 17.0 5.0 0.14 2.8 AHC; PFT
3R 4 1330 17.0 26.6 9.6 0.93 9.7 AHC; PFT, Whirl-Pak
4R 4 1620 26.6 27.7 1.1 0.48 43.6 AHC; PFT, Whirl-Pak
5R 4 2100 27.7 32.2 4.5 0.57 12.7 PFT, Whirl-Pak
6R 4 2310 32.2 36.2 4.0 0.50 12.5 PFT, Whirl-Pak
7R 5 0230 36.2 40.7 4.5 0.83 18.4 PFT, Whirl-Pak
8R 5 0500 40.7 45.7 5.0 0.66 13.2 PFT, Whirl-Pak
9R 5 0635 45.7 50.5 4.8 0.16 3.3
10R 5 0845 50.5 55.5 5.0 1.30 26.0
11R 5 1045 55.5 60.1 4.6 1.05 22.8
12R 5 1315 60.1 65.1 5.0 1.64 32.8
13R 5 1515 65.1 69.8 4.7 0.82 17.5
14R 5 1715 69.8 74.8 5.0 0.62 12.4
15R 5 2000 74.8 79.5 4.7 0.62 13.2
16R 5 2225 79.5 84.5 5.0 0.27 5.4
17R 6 0250 84.5 89.1 4.6 1.18 25.7
18R 6 0530 89.1 94.1 5.0 1.08 21.6
19R 6 0905 94.1 98.8 4.7 1.34 28.5
20R 6 1340 98.8 103.8 5.0 1.24 24.8



Cored totals: 103.8 15.90 15.3

Notes: AHC = active heave compensation. PFT = perfluorocarbon tracer.