Table T1. Coring summary, Site 1274.
Hole 1274A
Latitude: 15°38.8669´N
Longitude: 46° 40.5824´W
Time on site: 93.25 (0030 hr, 15 Jun–2145 hr, 18 Jun 2003)
Seafloor (drill pipe measurement from rig floor, mbrf): 3951.0
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 3939.8
Total depth (drill pipe measurement from rig floor, mbrf): 4106.8
Total penetration (meters below seafloor, mbsf): 155.8
Total length of drilled intervals (m): 0.0
Total core recovered (m): 34.65
Core recovery (%): 22.2
Total number of cores: 28
Core
Date
(Jun 2003)
Local time (hr)
Depth (mbsf)
Length (m)
Recovery
(%)
Remarks
Top
Bottom
Cored
Recovered
209-1274A-














WSTP before spudding
1R 15 1450 0.0 11.9 11.9 1.10 9.2 AHC
2R 15 1635 11.9 16.9 5.0 0.41 8.2 AHC
3R 15 1930 16.9 21.3 4.4 1.15 26.1
4R 15 2300 21.3 26.3 5.0 1.70 34.0 AHC
5R 16 0205 26.3 30.8 4.5 2.52 56.0
6R 16 0555 30.8 35.8 5.0 3.00 60.0
7R 16 0845 35.8 40.0 4.2 1.75 41.7
8R 16 1105 40.0 45.3 5.3 2.05 38.7 Whirl-Pak
9R 16 1305 45.3 49.9 4.6 0.55 12.0 Whirl-Pak
10R 16 1450 49.9 54.9 5.0 0.48 9.6
11R 16 1635 54.9 59.4 4.5 0.98 21.8 Dropped deplugger
12R 16 2225 59.4 64.4 5.0 1.42 28.4
13R 17 0030 64.4 69.0 4.6 0.90 19.6
14R 17 0305 69.0 74.0 5.0 1.36 27.2
15R 17 0615 74.0 83.7 9.7 1.94 20.0 Whirl-Pak
16R 17 0835 83.7 88.3 4.6 2.19 47.6 Whirl-Pak
17R 17 1030 88.3 93.3 5.0 1.35 27.0
18R 17 1240 93.3 97.9 4.6 1.38 30.0
19R 17 1415 97.9 102.9 5.0 0.20 4.0
20R 17 1700 102.9 112.5 9.6 1.09 11.4
21R 17 1945 112.5 122.1 9.6 0.67 7.0
22R 17 2240 122.1 126.8 4.7 0.65 13.8
23R 18 0040 126.8 131.8 5.0 1.68 33.6
24R 18 0220 131.8 136.5 4.7 1.10 23.4 AHC
25R 18 0405 136.5 141.5 5.0 0.52 10.4 AHC
26R 18 0600 141.5 146.1 4.6 0.70 15.2
27R 18 0820 146.1 151.1 5.0 1.50 30.0 AHC; Whirl-Pak
28R 18 1130 151.1 155.8 4.7 0.31 6.6 AHC; Whirl-Pak



Cored totals: 155.8 34.65 22.2

Notes: WSTP = Water Sampling Temperature Probe. AHC = active heave compensation.