Hole 1277A |
Latitude: 45°11.8002´N |
Longitude: 44°22.5999´E |
Time on site: 55 hr (1800 hr, 2 Sep–0100 hr, 5 Sep 2003) |
Seafloor (drill pipe measurement from rig floor, mbrf): 4639.4 |
Distance between rig floor and sea level (m): 11.2 |
Water depth (drill pipe measurement from sea level, m): 4628.2 |
Total depth (drill pipe measurement from rig floor, mbrf): 4819.7 |
Total penetration (m): 180.3 |
Total length of cored section (m): 76.4 (103.9–180.3 mbsf) |
Total core recovered (m): 29.24 (not including 2.29 m from wash Core 210-1277A-1W) |
Core recovery (%): 38 |
Total number of cores: 8 |
Total number of drilled intervals: 1 (0–103.9 mbsf) |
Total length of drilled interval without coring (m): 103.9 |
Core
|
Date
(Sep 2003)
|
Local time (hr)
|
Depth (mbsf)
|
|
Length (m)
|
Recovered (%)
|
Comment
|
||
---|---|---|---|---|---|---|---|---|---|
Top
|
Bottom
|
Cored
|
Recovered
|
||||||
210-1277A- |
|
|
|
|
|
|
|
|
|
1W | 3 | 1050 | *****Drilled without coring from 0 to 103.9 mbsf***** |
|
2.29 m recovered in wash core | ||||
2R | 3 | 1315 | 103.9 | 113.6 |
|
9.7 | 2.43 | 25 |
|
3R | 3 | 1640 | 113.6 | 123.0 |
|
9.4 | 4.65 | 49 |
|
4R | 3 | 2000 | 123.0 | 132.6 |
|
9.6 | 2.83 | 29 |
|
5R | 3 | 2300 | 132.6 | 142.1 |
|
9.5 | 3.02 | 31 |
|
6R | 4 | 120 | 142.1 | 151.8 |
|
9.7 | 0.90 | 9 |
|
7R | 4 | 425 | 151.8 | 161.5 |
|
9.7 | 2.60 | 26 |
|
8R | 4 | 810 | 161.5 | 170.7 |
|
9.2 | 2.66 | 28 |
|
9R | 4 | 1215 | 170.7 | 180.3 |
|
9.6 | 10.15 | 105 | Last core of Leg 210 and ODP |
|
|
|
|
Total: |
|
76.4 | 29.24 | 38 |
|