161 Preliminary Report



OPERATIONS SUMMARY

Total Days (3 May, 1995 - 2 July, 1995) 61.4
Total Days in Port 3.5
Total Days Underway 13.8
Total Days on Site 44.1

Stuck Pipe/Downhole Trouble 0.7
Tripping 5.0
Other 0.6
Drilling 1.7
Coring 28.1
Re-entry 0.8
Logging/Downhole Science 6.7
Fishing & Remedial 0.0
Repair Time (ODP) 0.4
Development Engineering 0.0
Repair Time (Contractor) 0.0
WOW 0.0
Casing & Cementing 0.1

Total Distance Traveled (nmi) 3060.0
Total Miles Transited (nmi) 2930.0
Average Speed Transit (kt) 10.2
Total Miles Surveyed (nmi) 130.0
Average Speed Survey (kt) 5.6
Number of Sites 6
Number of Holes 16
Total Interval Cored (m) 4591.3
Total Core Recovered (m) 3874.63
% Core Recovery 84.4
Total Interval Drilled (m) 737.6
Total Penetration (m) 5328.9
Maximum Penetration (m) 928.7
Maximum Water Depth (m from drilling datum) 3469.7
Minimum Water Depth (m from drilling datum) 1074.0