163 Preliminary Report



OPERATIONS
SUMMARY

Total days (3 September 1995 - 7 October 1995) 33.91
Total days in port 7.10
Total days underway 10.13
Total days on site 16.68

Tripping time 3.04
Coring 7.19
Reentry 0.78
Waiting on weather 3.25
Stuck pipe/downhole trouble 0.10
Drilling 2.11
Repair time (contractor) 0.21
Logging/downhole science 0.00
Other 0.00

Total distance traveled (nmi) 2787.0
Average transit speed (kt) 9.9
Number of sites 3.0
Number of holes 4.0
Number of cores attempted 46.0
Total interval cored (m) 294.3
Total core recovery (m) 204.6
% core recovery 69.5
Total interval drilled (m) 186.0
Total penetration (m) 480.3
Maximum penetration (m) 342.7
Minimum penetration (m) 32.0
Maximum water depth (m from drilling datum) 552.4
Minimun water depth (m from drilling datum) 272.7


163 Table of Contents

Publications Home

(ODP Home)