165 Preliminary Report



OPERATIONS SUMMARY


Total Days (19 December 95 to 17 February 96): 60.2

Days in Port: 2.9

Days Underway: 12.7

Days On-Site: 44.7

Total Distance Traveled (nautical miles): 3084

Total Miles Transited: 3047

Average Speed Transit (knots): 10.3

Total Miles Surveyed: 37

Average Speed Survey (knots): 5.0

Number of Sites: 5

Number of Holes: 13

Total Interval Cored (m): 4178.4

Total Core Recovery (m): 3358.82

% Core Recovery: 80.4

Total Interval Drilled (m): 1774.0

Total Penetration (m): 5952.4

Maximum Penetration (m): 1066.4

Maximum Seafloor Depth (meters from drilling datum): 3271.0

Minimum Seafloor Depth (meters from drilling datum): 904.1


To Site Summary

165 Table of Contents

Publications Home

ODP Home