Total Days (19 December 95 to 17 February 96): 60.2
Days in Port: 2.9
Days Underway: 12.7
Days On-Site: 44.7
Repair Time (ODP): 0.1
Tripping: 7.3
Logging/Downhole Science: 4.5
Drilling: 2.4
Other: 2.4
Casing and Cementing: 1.0
Stuck Pipe/Downhole Trouble: 0.0
Development Engineering: 0.0
Repair Time (Contractor): 0.0
W.O.W.: 0.0
Fishing & Remedial: 0.0
Total Miles Transited: 3047
Average Speed Transit (knots): 10.3
Total Miles Surveyed: 37
Average Speed Survey (knots): 5.0
Number of Sites: 5
Number of Holes: 13
Total Interval Cored (m): 4178.4
Total Core Recovery (m): 3358.82
% Core Recovery: 80.4
Total Interval Drilled (m): 1774.0
Total Penetration (m): 5952.4
Maximum Penetration (m): 1066.4
Maximum Seafloor Depth (meters from drilling datum): 3271.0
Minimum Seafloor Depth (meters from drilling datum): 904.1