Total Days (17 February to 10 April 1996) 52.72 Total Days in Port (Repairs) 4.63 Total Days Underway 6.80 Total Days on Site 41.29 Tripping Time 3.77 Coring 24.39 Reentry Time 0.00 W.O.W. 0.00 Stuck pipe/Hole trouble 0.000 Drilling 4.16 Mechanical Repair Time (Contractor) 0.00 Logging/Downhole Science 6.83 Other 0.20 Total Distance Travelled (nautical miles) 2045.0 Average Speed Transit (knots) 11.9 Number of Sites 7 Number of Holes 17 Number of Cores Attempted 572 Total Interval Cored (m) 5254.9 Total Core Recovery (m) 2933.8 % Core Recovery 55.8 Total Interval Drilled (m) 2197.5 Total Penetration 7452.4 Maximum Penetration (m) 1300.0 Minimum Penetration (m) 6.6 Maximum Water Depth (m from drilling datum) 669.9 Minimum Water Depth (m from drilling datum) 319.7