| Total Days (19 April 1996 to 16 June 1996) | 58.00 | |||
| Total Days in Port | 1.60 | |||
| Total Days Underway | 12.85 | |||
| Total Days on Site | 43.40 | |||
| Coring | 30.85 | |||
| Tripping Time | 7.49 | |||
| Logging/Downhole Science | 4.27 | |||
| Mechanical Repair Time (Contractor) | 0.18 | |||
| Stuck pipe/Hole Trouble | 0.15 | |||
| Reentry Time | 0.00 | |||
| W.O.W. | 0.00 | |||
| Drilling | 0.00 | |||
| Other | 0.00 | |||
| Total Distance Traveled (nmi) | 3102 | |||
| Average Speed Transit (kt): | 10.3 | |||
| Number of Sites | 13.0 | |||
| Number of Holes | 52.0 | |||
| Number of Cores Attempted | 840.0 | |||
| Total Interval Cored (m) | 7709.5 | |||
| Total Core Recovery (m) | 7501.5 | |||
| % Core Recovery | 97.30 | |||
| Total Interval Drilled (m) | 0.0 | |||
| Total Penetration | 7709.5 | |||
| Maximum Penetration (m) | 449.0 | |||
| Minimum Penetration (m) | 9.2 | |||
| Maximum Water Depth (m from drilling datum) | 4226.4 | |||
| Minimum Water Depth (m from drilling datum) | 911.9 | |||