167 Preliminary Report


Tripping Time - 18%; Logging/Downhole Science - 10%; Coring - 72%; All Other <1%

43.4 Total Days on Site (75%); 1.6 Total Days in Port (3%); 12.7 Total Days Underway (22%); Total Days of Leg = 57.9

To 167 Technical Report

To 167 Table of Contents

ODP Publications

ODP Home