OPERATIONS REPORT

The drilling and engineering personnel aboard the JOIDES Resolution for Leg 174A were:

Operations ManagerGene Pollard
Operations EngineerBrian Jonasson
Schlumberger EngineerSteve Kittredge
Anadrill EngineerThomas Horton


TRANSIT TO SITE 1071

The vessel departed Halifax at 1812 hr on Friday, 20 June, 1997. The 578-nmi transit to Site 1071 was accomplished at an average speed of 10.8 kt. The vessel arrived on location at 2330 hr on 22 June, 1997. All times reported are in local time (U.S. Eastern Time Zone; UTC = 4 hr).