OPERATIONS RESUME
Total days (9 April 1998 to 7 June 1998) |
|||
Total days in port |
12.52 |
||
Total days under way |
25.95 |
||
Total days on site |
20.61 |
||
days |
|||
Drilling |
3.30 |
||
Other |
0.31 |
||
Tripping time |
5.59 |
||
Stuck pipe/hole trouble |
0.19 |
||
Logging/downhole science |
0.46 |
||
Mechanical repair time (contractor) |
0.05 |
||
Reentry time |
1.83 |
||
W.O.W. |
1.34 |
||
Coring |
5.18 |
||
Casing and cementing |
1.02 |
||
Development engineering |
1.33 |
||
Total distance traveled (nautical miles) |
6439.00 |
||
Average speed transit (knots): |
10.40 |
||
Number of sites |
4.00 |
||
Number of holes |
12.00 |
||
Number of cores attempted |
30.00 |
||
Total interval cored (m) |
143.00 |
||
Total core recovery (m) |
118.40 |
||
Core recovery (%) |
82.82 |
||
Total interval drilled (m) |
479.00 |
||
Total penetration |
670.80 |
||
Maximum penetration (m) |
493.80 |
||
Minimum penetration (m) |
0.00 |
||
Maximum water depth (m from drilling datum) |
1659.00 |
||
Minimum water depth (m from drilling datum) |
739.00 |