OPERATIONS RESUME

 

Total days (9 April 1998 to 7 June 1998)

Total days in port

12.52

Total days under way

25.95

Total days on site

20.61

days

Drilling

3.30

Other

0.31

Tripping time

5.59

Stuck pipe/hole trouble

0.19

Logging/downhole science

0.46

Mechanical repair time (contractor)

0.05

Reentry time

1.83

W.O.W.

1.34

Coring

5.18

Casing and cementing

1.02

Development engineering

1.33

Total distance traveled (nautical miles)

6439.00

Average speed transit (knots):

10.40

Number of sites

4.00

Number of holes

12.00

Number of cores attempted

30.00

Total interval cored (m)

143.00

Total core recovery (m)

118.40

Core recovery (%)

82.82

Total interval drilled (m)

479.00

Total penetration

670.80

Maximum penetration (m)

493.80

Minimum penetration (m)

0.00

Maximum water depth (m from drilling datum)

1659.00

Minimum water depth (m from drilling datum)

739.00

 